Audio By Carbonatix
The Bui Power Authority (BPA) has reaffirmed its commitment to helping the Government to meet its target of ensuring that 10 per cent of power generation by the year 2030 is of renewable energy source.
Parliament amended the BPA Act in 2020, which empowered the Authority to develop renewable energy and other clean energy alternatives in the country.
The amendment strengthens the many efforts the Authority was undertaking in the renewable energy space.
Dr George Tettey, the Deputy CEO of the BPA in an interaction with the media in Accra over the Authority’s development plans for the year, said that Authority had started a drive-in that regard which included completing the construction of the first 50MW of the 250MW Hydro-Solar Hybrid project.
The hybridization would aid in the regulation of the Bui reservoir by retaining more water in the reservoir for four year-round power generation at the Bui Generating Station.
The Authority did this by constructing 9MW of the project and 1MW of the floating solar project with a developer undertaking the 40MW on the Bui reservoir, he said.
Dr. Tettey said this was the first of its kind in the West African sub-region, adding that engineers were currently conducting various tests on the 1MW system and would add it to the National Grid this year.
“The Authority aims to increase the capacity of the floating solar system to 5MW by end of 2021,” he said.
The Authority, he said, had also designed and constructed the 45Kw Tsatsadu Generating Station (TGS) at Alavanyo in the Volta Region, in collaboration with the Ministry of Energy, Energy Commission, United Nations Development Programme, and the International Network on Small Hydro Power of China.
The Deputy CEO said experience from the construction of the Bui Hydroelectric Project was instrumental in the design and implementation of the first micro hydro plant in Ghana by the young Engineers of BPA with local expertise.
“This project also serves as a practical tutorial plant for engineering students across the country and the West African sub-region,” he said.
Dr. Tettey said the BPA’s main target for 2021 was to consolidate the strides they had made in 2020, which culminated in the receipt of different awards from the Ghana Energy Awards – the Clean Energy Initiative of the Year and the Energy Company of the Year (Renewable) for the second year running for the Authority with its CEO Mr Fred Oware being adjudged the Energy Personality of the Year.
Latest Stories
-
England are tough, but we can play against Ghana, Panama – Croatia coach reacts to World Cup draw
44 minutes -
We can beat anyone – Otto Addo reacts to World Cup draw
59 minutes -
GPL 2025/26: Mensah brace fires All Blacks to victory over Eleven Wonders
2 hours -
This Saturday on Newsfile: Petitions against the OSP, EC heads, and 2025 WASSCE results
3 hours -
Ambassador urges U.S. investors to prioritise land verification as Ghana courts more investment
3 hours -
Europe faces an expanding corruption crisis
3 hours -
Ghana’s Dr Bernard Appiah appointed to WHO Technical Advisory Group on alcohol and drug epidemiology
4 hours -
2026 World Cup: Ghana drawn against England, Croatia and Panama in Group L
4 hours -
3 dead, 6 injured in Kpando–Aziave road crash
4 hours -
Lightwave eHealth accuses Health Ministry of ‘fault-finding’ and engaging competitor to audit its work
4 hours -
Ayewa Festival ignites Farmers Day with culture, flavour, and a promise of bigger things ahead
4 hours -
Government to deploy 60,000 surveillance cameras nationwide to tackle cybercrime
4 hours -
Ghana DJ Awards begins 365-day countdown to 2026 event
4 hours -
Making Private University Charters Optional in Ghana: Implications and Opportunities
4 hours -
Mampong tragedy: Students among 30 injured as curve crash kills three
5 hours
