Audio By Carbonatix
The Deputy Campaign Coordinator for Special Operations of the National Democratic Congress (NDC), Chief Biney Hamilton Nixon, has asked President Akufo-Addo to apologise to the nation over the stalled National Cathedral project.
He warned that the President’s failure to deliver on his promise could bring a curse upon the country.
In a Facebook post, Chief Biney said the unfinished National Cathedral which was touted to be a beacon of Christian unity is now widely regarded as a national embarrassment.
The National Cathedral, one of the projects under the New Patriotic Party (NPP) that inspired hope among many Ghanaians, especially Christians, has now been riddled with delays and growing frustration.
According to Mr Biney, there’s a stark contrast between that initial optimism and the current state of affairs.

“What was promised as a symbol of national pride has now become an empty, unfinished site, leaving Ghanaians questioning the leadership and integrity of the project. Some of the church members are secretly expressing doubt about seeing their Pastors on the board.
“Great men of God called on the Christian community to rally behind this project. But today, the entire cathedral has become a scam in the eyes of many. People feel betrayed, and it’s time for the President to address this,” he added.
He expressed deep concern that the president’s silence, with just two months left to end his tenure, could have long-lasting consequences for the country.
“Mr President, you said you would build this cathedral at all costs, but today, we are left with nothing but a hole. You owe an apology to the people of Ghana—and most importantly, to God.
“You demolished judges’ bungalows and left behind an unfinished project. If you leave office without addressing this failure, it could be a curse on the nation and family.”
The construction of the National Cathedral officially began in March 2020 to serve as a state-of-the-art national place of worship and national events. The National Cathedral is still under construction at the foundation level, as of 2024 although 58 million cedis is said to have been spent on it.
Latest Stories
-
Gov’t approves payment plan for nurses and midwives’ salary arrears
6 minutes -
No arrangement to send DVLA staff abroad – Foreign Affairs Ministry contradicts DVLA boss
36 minutes -
US and Iran hold talks seen as crucial to prevent conflict
45 minutes -
Spain to check Gibraltar arrivals under post-Brexit deal
48 minutes -
Insurance cover crucial for canoe fishermen – Prof Benjamin Campion
53 minutes -
Communications Minister engages GIFEC staff, pledges support for welfare and institutional growth
55 minutes -
Zenith Bank pledges support for Ghana Medical Trust Fund ahead of April launch
60 minutes -
Ghana needs offshore patrol vessels to counter piracy effectively – Ntim Fordjour
1 hour -
Atlas Commodities rejects Assafuah’s warehouse claim, says it operates depots in four regions
1 hour -
KMA bans sale of explosives at Kejetia Market amid security concerns
1 hour -
E&P controls 45% of Ghana’s mining operations, eyes greater role in economic growth
2 hours -
Ghana Navy and Armed Forces complete rescue of 71 fishermen after armed sea robbery off Central coast
2 hours -
Hillary Clinton to testify she ‘had no idea’ of Epstein crimes and calls for Trump to be questioned
2 hours -
Parliament passes Ghana’s first Accelerated National Reserve Accumulation Policy
2 hours -
Investing adequately in waste can earn Ghana GHS 47.9bn in annual benefit by 2032 – ISSER
2 hours
