
Audio By Carbonatix
The Minister for Roads and Highways, Kwame Governs Agbodza, has directed Maripoma Enterprise Limited, the contractor constructing the Dambai Bridge, to complete the project on schedule, within budget and without compromising on quality.
According to the Minister, the bridge is a critical infrastructure project that will improve connectivity in the Oti Region, enhance the movement of people and goods, and stimulate economic activities in Dambai and its surrounding communities.
Mr. Agbodza gave the directive during an inspection of the project as part of his nationwide road inspection tour of the Oti Region, where he urged the contractor to remain committed to meeting project timelines while adhering to the required engineering standards.
He noted that the bridge is being financed entirely by the Government of Ghana, making it imperative that the project delivers lasting value to the country and its people.
“We are doing this with our own resources. No amount of it is a loan we took from other countries so Ghanaians must be proud that for once we are spending our own money to do something like this. I think the contractors will be guided and help as much as possible to be able to deliver on time, on budget and without compromising on the quality,” he said.
The Roads and Highways Minister stressed that the government expects the Dambai Bridge to be delivered to the highest engineering standards to ensure its long-term durability and maximise its contribution to the socio-economic development of the Oti Region.
Latest Stories
-
Absa Bank empowers Persons with Disabilities through financial literacy programme
1 minute -
Joyce Bawah Mogtari calls for collective responsibility to tackle flooding and waste management challenges
12 minutes -
Agbodza warns contractors against using weather as excuse for road project delays
28 minutes -
Ghana Reference Rate rises to 10.59% in July, signalling possible increase in lending rates
30 minutes -
Asiedu Nketia urges Africa to move beyond raw material exports through industrialisation
33 minutes -
Contractor delaying Weija Paediatric Hospital handover, not government – Health Minister
35 minutes -
Auditor-General has recovered nearly GH¢12bn in disallowed expenditure in 2024 – PAC Chair
37 minutes -
Roads Minister urges contractors to adopt on-site design reviews to avoid project delays
37 minutes -
Agbodza criticises highways officials over failure to report delayed road projects
38 minutes -
Government approves rehabilitation of Achimota School roads ahead of centenary celebrations
41 minutes -
‘It’s been tough’ – Opare Addo says gov’t needed 18 months to understand youth jobs crisis
42 minutes -
Energy Minister engages AGI on strengthening partnership to support industry
46 minutes -
Bawah Mogtari urges Ghanaians to turn flood crisis into opportunity for sustainable sanitation practices
48 minutes -
Three KMA officers injured as residents resist demolition exercise in Kumasi
50 minutes -
Youth Ministry found ‘fragmented’ gov’t programmes holding back jobs – George Opare Addo
51 minutes