Audio By Carbonatix
Jubilee Operator, Tullow Oil has initiated moves to procure a second Floating, Storage, Processing and Offloading (FPSO) Vessel for the country’s oil production.The FPSO will serve Tullow’s 3 to 4 billion dollar Enyenra project.
The oil company is set to launch a design bid in the days ahead. This involves four companies namely MODEC which constructed the current FPSO Kwame Nkrumah, BW Offshore, EMAS Offshore and SBM. JOY BUSINESS sources say the Jubilee field operator has been considering whether to pit two or three contractors against each other, with a final decision expected sometime this month.
The design contest is expected to run for up to about six months, paralleling an appraisal drilling campaign that is currently ongoing. At the end of the bidding, which may be revisited if appraisal wells throw up unexpected results, Tullow will select its preferred contractor “based on design and cost” before or during the second quarter of next year. First oil could then be achieved in early 2015 or possibly late 2014 if everything goes smoothly.
Sources say there is some resistance among the project partners to shortlist Modec for the work, even though the company supplied the FPSO Kwame Nkrumah for the Jubilee project. If Modec is therefore left by the wayside and Tullow decides on two contractors, project watchers have tipped BW and SBM as the likely pair. However, with BW believed to be in talks with Mexican state oil company Pemex about supplying two heavy oil FPSOs, the Norwegian company’s priorities may be elsewhere. In that case, SBM and Emas could go head to head.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
When Fear Becomes Content: The Ebo Noah Prophecy and the Question of Accountability
7 seconds -
Salaga South MP launches support scheme for women, students and youth
5 minutes -
2 killed in police shooting during Abosso galamsey protest
8 minutes -
Port of Tema dismisses claims of strike and operational disruptions
38 minutes -
Concerned Small-Scale Miners laud Sammy Gyamfi’s leadership at Goldbod
43 minutes -
Prince Amoako Jnr reflects on impact after successful PAJ Foundation tournament
52 minutes -
A day of love and hope for orphans: All set for Nhyira Aboodoo
1 hour -
Water’s whisper gone silent: Are Ghana’s cities ready for the thirsty future?
1 hour -
Police apprehend serial burglar hiding in bank ceiling after festive crime spree
1 hour -
Police arrest 23-year-old man for allegedly murdering father in Oti Region
1 hour -
ICGC-Jesus Temple fêtes patients at Eastern Regional Hospital
2 hours -
Seidu Agongo builds lifeline facility for Ghana Police Hospital’s ‘Unknown Patients’
2 hours -
Ghana ‘scandalised’ by rising job losses under NDC – Dr Adomako Kissi
2 hours -
De Mayor Foundation supports over 700 widows and vulnerable persons in Adeiso
2 hours -
Poll shows Mahama widening lead in hypothetical 2024 re-run
3 hours
