
Audio By Carbonatix
Repair works are underway on the bridge linking Cape Coast to Twifo Praso in the Central Region, which collapsed on Sunday, June 19.
Videos and photos showed a section of the road had completely caved in, rendering the route inaccessible.
The bridge is known to serve commuters from Cape Coast to Jukwa and also from Dunkwa-On-Offin.
However, the Head of Public Relations for the Ghana Highways Authority, Cecil Obodai Wentum, said it will be repaired on time to bring relief to affected commuters.

“The only problem or challenge was that there was the need for us to wait for the water to recede so that the contractor would start work,” Mr. Wentum disclosed.

“The contractor has collected enough boulders and is using it to fill the portions that have been cut off,” he added.
Meanwhile, a temporary bypass has been created for cut-off communities.
Latest Stories
-
Armed men reportedly storm Adjen Kotoku Onion Market amid tensions
48 minutes -
Tecco Mensah writes: Why football fans must look beyond statistics
2 hours -
Police recover stolen Honda CR-V in Kumasi within 48 hours
2 hours -
Apetorku Gbodzi 2026 Festival opens in Dagbamete with development focus
2 hours -
President Mahama arrives in Lyon to co-chair One Health Summit
2 hours -
Beverly View Plus Hotel draws crowds amid coastal Easter rush in Volta
2 hours -
Maiden Zongo Festival held in Wa amid calls to tackle drug abuse among the youth
3 hours -
FDA warns of fake HIV test kits on Ghanaian market
3 hours -
Africa urged to build resilient health systems as donor support tightens
3 hours -
Easter gesture: Ablakwa settles medical bills for 85 North Tongu constituents
5 hours -
Africa must harness its population strength—Titus-Glover
5 hours -
Visa-free access doesn’t mean unlimited stay – Lom Ahlijah
5 hours -
From Golgotha to Kwahu: The Easter Migration of the Faithful and the Faithless
7 hours -
How the Ghanaian onion traders’ standoff with Nigeria unfolded and threatened local supply
7 hours -
No compensation for demolished structures on 24-Hour Economy market lands — Gov’t to structure owners
7 hours