Audio By Carbonatix
After years of flooding fears, the Odaw River defied expectations following Sunday’s heavy downpour in Accra—remaining within its banks and sparing surrounding communities the usual chaos. Residents attribute the unexpected relief to an ongoing dredging exercise commissioned by the government.
While many welcomed the effort, skepticism over its long-term impact is growing.
“They should know we’re in the rainy season,” one resident near the Odaw told JoyNews. “Waiting till the sand dries before collecting it is not ideal. Everything will just go back into the drain. It’s all a waste of time.”
The concern? Heaps of silt and waste removed from the river are being left at the edge of the Odaw. With more rains expected, residents fear the debris will simply be washed back into the lagoon, undoing the work.
A nearby shoe vendor echoed the sentiment. “Dredging is good, but how sustainable is this method of theirs? All the filth and sand desilted will go back into the lagoon.”
The Odaw dredging is part of a broader flood mitigation plan under the Greater Accra Resilient and Integrated Development Project (GARID). The initiative includes the expansion of drains in Kaneshie and reconstruction of a major channel from Nima-Paloma on the Ring Road to the Odaw outfall.
Yet, progress is uneven.
Several communities within the Korle Klottey Municipality, which lies downstream of the Odaw, say they’ve seen no dredging activity. As a result, homes and properties in these areas suffered significant flooding after Sunday’s rain, though thankfully, no lives were lost.

Municipal Chief Executive for Korle Klottey, Hon. Allotey Gaisie, says his office is pushing to fund a permanent solution.
“We’ve had this challenge over the years,” he told JoyNews. “As an Assembly, we want to fix the problem—not walk in here every time to sympathize and hand out relief. It’s time to look at the drainage system and do something about it. We’ve decided to fix this once and for all.”
GARID Project Coordinator, Dr. Ohene Sarfo, in an earlier press briefing on April 13, 2025, acknowledged that flood control interventions were ongoing. However, the Minister for Works and Housing, Kojo Oppong Nkrumah, has admitted the project’s pace has been slower than expected—an admission that still reflects the current situation.
For now, while the Odaw’s calm after the storm brings hope, residents are calling for a more sustainable, community-engaged and forward-thinking approach to flood management—before the rains return in full force.
Latest Stories
-
Mahama Ayariga leads NDC delegation to Bawku ahead of Samanpiid Festival
3 hours -
Edem warns youth against drug abuse at 9th Eledzi Health Walk
7 hours -
Suspension of new DVLA Plate: Abuakwa South MP warns of insurance and public safety risks
7 hours -
Ghana’s Evans Kyere-Mensah nominated to World Agriculture Forum Council
8 hours -
Creative Canvas 2025: King Promise — The systems player
8 hours -
Wherever we go, our polling station executives are yearning for Dr Bawumia – NPP coordinators
8 hours -
Agricultural cooperatives emerging as climate champions in rural Ghana
9 hours -
Fire Service rescues two in truck accident at Asukawkaw
9 hours -
Ashland Foundation donates food items to Krachi Local Prison
9 hours -
Akatsi North DCE warns PWD beneficiaries against selling livelihood support items
9 hours -
Salaga South MP calls for unity and peace at Kulaw 2025 Youth Homecoming
10 hours -
GPL 2025/2026: Gold Stars triumph over Dreams in five-goal thriller
11 hours -
Ibrahim Mahama supports disability groups with Christmas donation
11 hours -
2025/26 GPL: Berekum Chelsea come from behind to beat XI Wonders 3-1
11 hours -
NACOC dismantles drug dens in Eastern and Greater Accra regions in ‘Operation White Ember’
12 hours
