Audio By Carbonatix
Some 17 Metropolitan and Municipal Assemblies (MMAs) in the Greater Accra Region have received over GHS 8 million to improve drainage infrastructure under the Greater Accra Resilient and Integrated Development (GARID) Project.
This follows the disbursement of a total of GH¢ 10. 9 million in 2022 and 2023 for the same goal.
The beneficiary assemblies are expected to use the grant to improve the operation and maintenance (desilting) of drainage and solid waste management in communities along the Odaw River channel.
The GARID Project Coordinator, Dr Ohene Sarfoh, who disclosed this at an event to distribute some multipurpose drones to the project beneficiaries, said the assemblies received a total grant between GH¢ 5.6 million to about GH¢ 7.2 million based on their performances on how well they used the 2023 grant.
“The grant is part of the result-based financing mechanisms the GARID Project has put in place to improve drainage maintenance and solid waste management among the project implementing MMAs. The initial tranches of the grant were disbursed equally to all the seventeen beneficiary Assemblies. However, the disbursement of the 2024 tranche and the subsequent ones would be based solely on performance assessments of how well the assemblies used the grant they received the previous year.”
Dr Sarfoh announced that a total of $3,250,000 had been earmarked for disbursement to the 17 project beneficiary assemblies over a 5-year period.
He said a significant proportion of the grant for the previous years was used by the assemblies for desilting priority drains they had identified which contributed to the reduction of the incidence of flooding in various localities of the city where the Odaw River traverses.
“Part of the grant was also channeled into institutional development including development of drainage network maps, condition assessments of the drains in the flooding hotspots, procurement of logistics, and for training some staff of the beneficiary assemblies” said the Project Coordinator.
He urged them to make good use of the grant to curb incidences of flooding in Accra.
The GARID project is being implemented by the government of Ghana with credit facility from the World Bank and aims at improving drainage, solid waste management and infrastructure in priority flood-prone informal settlements within the Odaw River Basin.
The project beneficiary assemblies include the Accra Metropolitan Assembly; Ablekuma Central, North, and West Municipal Assemblies; Adentan Municipal Assembly; Ayawaso Central, East, North, and West Municipal Assemblies.
The rest are the Ga Central, East, North, and West Municipal Assemblies; La Dade Kotopon Municipal Assembly; La-Nkwantanang Madina Municipal Assembly; Okaikoi North Municipal Assembly; and Korle-Klottey Municipal Assembly.
Latest Stories
-
ECG completes construction of 8 high-tension towers following pylon theft in 2024
1 second -
Newsfile to discuss 2026 SONA and present reality this Saturday
8 minutes -
Dr Hilla Limann Technical University records 17% admission surge
16 minutes -
Meetings Africa 2026 closes on a high, Celebrating 20 years of purposeful African connections
20 minutes -
Fuel prices to increase marginally from March 1, driven by crude price surge
33 minutes -
Drum artiste Aduberks holds maiden concert in Ghana
47 minutes -
UCC to honour Vice President with distinguished fellow award
1 hour -
Full text: Mahama’s State of the Nation Address
1 hour -
Accra Mayor halts Makola No. 2 rent increment pending negotiations with facility managers
1 hour -
SoulGroup Spirit Sound drops Ghana medley to honour gospel legends
2 hours -
ECG reinforces ‘Operation Keep Light On’ in Ashanti Region
2 hours -
UK remains preferred study destination for Ghanaians – British Council
2 hours -
Ghana Medical Trust Fund: Maame Samma Peprah ignites chain of giving through ‘Kyerɛ Wo Dɔ Drive’
2 hours -
A new children’s book celebrates Ghanaian culture and early literacy through food storytelling
2 hours -
Right To Play deepens fight against child labour through MLMR and MRMF projects
2 hours
