Audio By Carbonatix
The Ghana Water Company Limited (GWCL) is carrying out emergency maintenance works on its 42-inch and 21-inch transmission pipelines from the Kpong Water Treatment Plant.
Announcing the maintenance works, the management of GWCL, Tema Region, indicated that the works would be carried out by GWCL engineers from Wednesday, January 10, to Thursday, January 11.
This, it noted, would lead to some interruption in water supply for the two scheduled days the work would be done.
Management indicated that the areas that would be affected by the water supply interruption included the whole of Tema Township, Prampram, Dawhenya, Devtraco, Community 25, Ashaiman, Gbetseli, Afienya, and their immediate environs.
Residents in these areas are therefore advised by the management to store enough water for the period indicated.
It gave the assurance that the water supply would be restored to normalcy as soon as the works were completed.
Latest Stories
-
The paradox of plenty: How Ghana’s farmers are being sacrificed on the altar of a cheap import agenda
4 minutes -
Defence Ministry in ‘safe hands’ despite vacancy – Felix Kwakye Ofosu
5 minutes -
Why no Defence Minister yet? – Felix Kwakye Ofosu says Mahama sees no urgency
27 minutes -
Sam George petitions AG to probe $3.4m payment for CSA building project
39 minutes -
The Abronye Charge Sheet – misuse in plain sight
52 minutes -
Carvajal to leave Real Madrid after 23 years
52 minutes -
‘No bad blood’: Sam George downplays heated clash with Abena Osei-Asare
1 hour -
Damang Gold Mine sells another 100% of its gold output to GoldBod
1 hour -
Adansi Asokwa MP launches skills training programme for youth
1 hour -
EPA shuts down mining site allegedly linked to former Mpohor DCE
2 hours -
Health, educational institutions in deprived communities get free cement from Ghacem
2 hours -
GSA arrests Chinese managers for reopening locked mattress factory
2 hours -
Court grants GH¢63.5m bail to ex-NAFCO CEO and wife in alleged corruption trial
2 hours -
Kofi Jumah released after meeting GH¢30m bail terms
2 hours -
GSA shuts down 4 companies in Afienya over substandard mattresses
2 hours