Audio By Carbonatix
The Public Utilities Regulatory Commission (PURC) has recovered over GH¢4 million for the Electricity Company of Ghana (ECG) in the first half of 2025 through customer complaint interventions.
Out of 700 complaints lodged between January and June in the Greater Accra Region, the PURC resolved 689, representing 98 per cent. These resolutions resulted in payments totalling GH¢4,295,445.64 to ECG and GH¢173,986.60 to customers.
Madam Gifty Bruce-Nelson, Greater Accra Regional Manager of PURC, said a combined GH¢4,469,432.25 was disbursed to utility providers and consumers to promote sustainability and satisfaction.
“Quality of service tops the lists of complaints with 450 complaints where customers have challenges including frequent outages, faulty transformers, broken poles, faces going off, no flow of water and low pressure on water flow amongst others,” she said.
Madam Bruce-Nelson noted that complaints also included billing discrepancies, malfunctioning meters, and property damage due to outages.
Most reports were submitted electronically (406), with others via phone (117), walk-ins (56), written submissions (53), toll-free calls (21), and field visits (4).
Compared to the same period in 2024, 804 complaints were made, with 233 electronic submissions.
That year, ECG recovered GH¢11,441,875.55 and customers received GH¢552,972.69 through PURC’s efforts.
In her mid-year briefing, Madam Bruce-Nelson indicated that 555 complaints (79 per cent) were against ECG, 109 (16 per cent) against Ghana Water Company Limited (GWCL), and 36 (5 per cent) against customers.
She said the Commission had intensified public education efforts, conducted 20 visits to ECG service centres, and engaged in community, prepaid, and industrial monitoring.
“Power supply in all the communities visited was quite stable except for the Volo community which complained of frequent power outages which sometimes last for two days for power to be restored.
“Most postpaid meters in the community are SHEP meters which are not captured in the ECG system,” she noted.
In 2024, ECG recovered GH¢29,080,692.20 from 17 institutions out of a total debt of GH¢33,807,691.20, and customers received GH¢867,535.67.
That year, 1,444 complaints were lodged, with 99 per cent resolved.
Latest Stories
-
Former Ivory Coast coach Gasset dies
37 minutes -
An Open Letter to the Deputy Attorney General, Dr Justice Srem-Sai
44 minutes -
Humour at its finest at Kumasi Comedy Show
57 minutes -
Police Christmas special operation: 101 suspects arrested in Greater Accra
1 hour -
15 arrested after sporadic shootings at Ho central mosque
2 hours -
GES condemns alleged theft of food supplies at Awaso STEM SHS
2 hours -
DopeNation electrifies crowd at Joy FM’s Party in the Park
2 hours -
Philip Ayesu emerges as the 2025 Achimota Champion after beating Percival Kwadjo Ampoma
2 hours -
Support your own – Mr P tells Ghanaian artistes
2 hours -
Ghana EXIM Bank develops 5-year export-led growth strategy to drive trade expansion
3 hours -
Big Smiles, Bigger Bounces: Kids take over the fun at the Joy Party in the Park
3 hours -
Joy FM Party in the Park 2025: Kwabena Kwabena takes centre stage
4 hours -
Ghana-Nigeria cyber-fraud network dupes over 200 victims of $400,000
4 hours -
Tackling terrorism requires jobs and anti-corruption drive, not strikes alone – Nigerian security analyst
4 hours -
Terror attacks in Nigeria affect all faiths, not only Christians – Security analyst
4 hours
