Audio By Carbonatix
Traffic was held up for about two hours Thursday morning on the Tanoso-Abuakwa stretch of the Kumasi-Sunyani road, as the youth of Atwima Kwanwoma District protested against stalled works on that stretch.

Dualisation of the single-lane stretch is part of the Sofoline Interchange Project initiated by the government under John Agyekum Kufour.

Though the succeeding National Democratic Congress government under the late John Atta Mills and John Mahama, partly completed the main component, expansion of the road to Abukwa has stalled.

Residents and motorists say they endure persistent heavy traffic on the bad surface, riddled with pot-holes as a result of the stalled works on the road.

The following are some pictures from the demonstration.





Latest Stories
-
KNUST launches Ghana Photonics and Optics Laboratory
29 minutes -
Ghana’s reserve buffer shrinks to 4.2 months as BoG flags fresh external risks
34 minutes -
Ghana, China reaffirm commitment to deepen strategic partnership
38 minutes -
Mahama rings Nasdaq closing bell, declares Ghana ‘open for business’
44 minutes -
Judge blocks Trump’s White House media ban, orders access to be restored
46 minutes -
GNFS contains Dansoman, La fires and saves three adjoining buildings
48 minutes -
Parliament pushes for GH¢5.6m release to Petroleum Commission for data centre
53 minutes -
GNFS honours two officers for bravery during Sogakope flood rescue
54 minutes -
Bagbin pushes for direct election of ECOWAS Parliament members to deepen democracy
58 minutes -
Togbe Afede apologises for late start of Volta economic forum
1 hour -
Cedi depreciation hits 9.5% as renewed FX pressure weighs on currency
1 hour -
Togbe Afede calls for unity to accelerate Volta development
1 hour -
Finance Minister urges Ghanaians to demand tax invoices
1 hour -
Data Protection boss calls for connected regulators to tackle big tech power
1 hour -
Man arraigned before court for allegedly posing as soldier, stealing
2 hours