Audio By Carbonatix
The Ghana Water Company Limited (GWCL) in the Northern Region has announced a temporary shut down of its intake plant at Nawuni.
This follows the announcement of the impending spillage of the Bagre dam today.
According to the GWCL, the current water level stands at 31.50 feet even before the spillage.
The company said the maximum level the plant should take is 36 feet. GWCL is thus anticipating that the spillage would pose a threat to the dam.
A statement issued by the Public Relations Manager, Nii Abbey Nicholas, said any intake above the estimated maximum point, would put the plant in danger.
He therefore urged residents to conserve water in the coming days.
Management also assured the public and its cherished customers that water supply would continue once the river level is within its Standard Operating levels.
Latest Stories
-
Real Madrid wants to sign Barcelona’s Pedri: Report
57 minutes -
Spanish train drivers to begin nationwide strike after fatal crashes
1 hour -
Netherlands returns 3,500-year-old looted sculpture to Egypt
1 hour -
‘Trump’s psyche’: The aide driving president’s most controversial policies
1 hour -
Algeria begins to cancel air services agreement with UAE
2 hours -
Gunmen kill three people and abduct Catholic priest in northern Nigeria
2 hours -
‘I have not been the best dad lately – 2Face
5 hours -
Why top Nollywood stars were banned – Omotola Jalade Ekeinde ​
5 hours -
‘We don’t need to be best friends’ – Omotola speaks on alleged feud with Genevieve
5 hours -
MTN FA Cup: Defending champions Kotoko knocked out by AduanaÂ
5 hours -
Why I no longer go clubbing – Davido
5 hours -
S Korean crypto firm accidentally pays out $40bn in bitcoin
6 hours -
Washington Post chief executive steps down after mass lay-offs
6 hours -
Iranian Nobel laureate handed further prison sentence, lawyer says
6 hours -
U20 WWCQ: South Africa come from behind to draw against Black Princesses in Accra
6 hours
