Audio By Carbonatix
No casualties reported as UN Dash 8 Aircraft makes emergency belly landing after nose gear malfunction.
A United Nations Dash 8 (DH8D) aircraft operated by the United Nations Support Office in Somalia (UNSOS) made a safe emergency landing at Aden Adde International Airport in Mogadishu after experiencing a nose wheel failure.
According to a press statement from the Somali Civil Aviation Authority (SCAA), the aircraft took off from Mogadishu’s Aden Abdulle International Airport at 11:16 local time, heading to Baidoa.

Shortly after departure, the crew detected a technical issue with the nose wheel and decided to return to Mogadishu.
The plane executed a belly landing at 13:28 local time. Fortunately, all passengers and crew on board were unharmed, and the aircraft sustained minimal damage.
The Somali Civil Aviation Authority confirms an investigation has been launched to determine the cause of the nose wheel malfunction.

Latest Stories
-
Dr Ibn Chambas calls for Africans to ‘defend their dignity’
1 minute -
Let’s treat persons with disabilities right – GHS staff  urged
34 minutes -
Soldiers in Benin say they have seized power from President Talon
41 minutes -
Lionel Messi leads Inter Miami to MLS Cup glory
1 hour -
Soldiers on Benin’s national television claim to have seized power
1 hour -
Premier Tennis Club organizes Tema Farmers’ Day Tournament
1 hour -
Liberia, South Africa ex-First Ladies attend Lordina Foundation’s 5th health screening for retired ministers
1 hour -
KGL Foundation partners Premier Tennis club to celebrate Farmers’ Day
2 hours -
Adrobaa crowned winners as Milo U13 Championship makes grand return
3 hours -
NAIMOS seizes excavators and shuts down illegal Riverbank mining in Eastern Region
4 hours -
NAIMOS dismantles illegal foreign mining network along the Bia River
4 hours -
Zelensky signals progress in talks with US on peace plan
5 hours -
Policemen assaulted in Jirapa; AK-47 rifles stolen
7 hours -
Bibiani tragedy: Toddler killed by moving Toyota Pickup
7 hours -
Don’t scrap OSP – Anti-corruption CSO demands review
9 hours
