Audio By Carbonatix
The Minister of Works, Housing and Water Resources, Kenneth Gilbert Adjei, has signed a Memorandum of Understanding (MoU) with two leading Turkish infrastructure firms to undertake preliminary and detailed engineering designs for a major water treatment plant to serve communities in the eastern part of Accra.
The agreement was signed with Kocak Çevre, an engineering and construction company with extensive experience in the development of water supply systems and related infrastructure, and Hacıoğlu Holding A.Ş, a fully integrated infrastructure development and project execution company specialising in large-scale water systems, energy networks, superstructure, and logistics projects.
Under the joint partnership, the two firms will collaborate on the design of a proposed water treatment plant with a production capacity of approximately 300,000 cubic metres per day.

The facility is expected to significantly enhance potable water supply to beneficiary communities and fast-growing areas within the eastern corridor of Accra.
The sector Minister described the partnership as a major step towards addressing increasing water demand, which is driven by rapid urbanisation and population growth in the Greater Accra Region.
Once completed, the project is anticipated to improve water reliability, expand coverage, and strengthen long-term water security in the capital’s eastern zones.
The MoU marks the beginning of the technical planning phase, paving the way for full project development and eventual construction of the large-scale treatment facility.
Latest Stories
-
Central bank’s inflation fight since 2022 came at a cost – Prof Turkson
38 seconds -
If BoG isn’t a profit-making institution, it also can’t be a loss-making one – Kofi Bentil
39 minutes -
Rethinking intelligence in the age of Artificial Intelligence
1 hour -
‘Every day is about survival’ – Workers demand action beyond May Day celebrations
1 hour -
Clear leadership demonstrated in managing recent power crisis – Dr Theo Acheampong
1 hour -
Accountability is defective in the energy sector – Ben Boakye
1 hour -
From detection to creation: Why education must move beyond AI plagiarism
1 hour -
Ghanaians keep paying for inefficiencies in the power sector – Prof Bokpin
1 hour -
Ghana’s power system not robust, outages inevitable – Ben Boakye
1 hour -
Beyond insults: The I.D.E.M playbook for political parties in the age of the ‘social media minister’
1 hour -
Germany backs Moroccan sovereignty in Sahara dispute
2 hours -
Beyond Competence: How capacity shapes professional access and influence
2 hours -
Chamber of Mines calls on BoG to release full breakdown of mining export proceeds
2 hours -
We appeal to Ghanaians for patience as we replace more transformers – Energy Minister
2 hours -
Power stability has improved since 2025 compared to 2024 – Jinapor
2 hours