
Audio By Carbonatix
Five people have lost their lives over the last two months on the yet-to-be-completed Achimota Ofankor Highway.The five were knocked down by vehicles while attempting to scale the short retaining walls to cross from one section of the road to the other side.All five accidents, according to the Resident Engineer working on the Achimota-Ofankor Highway, Mr Shelter Lotsu, occurred right under the footbridge at Dome, a situation he described as unfortunate.There are four footbridges on the Achimota-Ofankor corridor, and according to Mr Lotsu, those footbridges were strategically located at places with high population density and bus stops for easy access but, unfortunately, people had decided to scale the retaining walls instead.Speaking to the Daily Graphic during a visit to the site, Mr Lotsu stated that drivers operating at the taxi rank at Dome, alarmed by the increasing number of accidents, had formed a task force to compel pedestrians to use the footbridges.Obviously, the task force cannot meet the challenges on the road, as a group of people, including women, were spotted scaling the short retaining wall right under the Dome footbridge to cross the six-lane road yesterday.The situation on the corridor is not an isolated one.Indeed, a few weeks after the completion and subsequent handover of the George Walker Bush Highway stretching from the Tetteh-Quarshie Interchange to the MaIlam Junction, a number of people who attempted to scale barricades separating the main carriageway from the service roads were knocked down.
Statistics from the Motor Traffic and Transport Unit (MTTU) of the Ghana Police Service indicate that from February 15 to August 31, this year there have been 253 crashes involving 447 vehicles on the George Bush Highway.Assistant Superintendent of Police Mr Alexander Obeng, who gave the figures, stated that 70 pedestrians were knocked down on the George Bush Highway during the period."So far, 182 people have been injured and 35 have died," he stated.Aside from the risk that pedestrians are exposed to, another ugly but common phenomenon on the Achimota-Ofankor Highway is the complete take-over of the walkways and bicycle lanes by traders.Traders turned the walkways and lanes into markets even before the paving works were completed, the area around the footbridges has equally been besieged by traders, limiting access to the facilities by pedestrians who lay be willing to use it.The 5.2-kilometre, three-lane Achimota-Ofankor dual carriageway with service roads and footbridges and overpasses is substantially completed.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
THE LAW 101 – The Herald’s Larry forced the hand of the Court?
4 minutes -
Ghana to host Lausanne Workplace Forum 2026
10 minutes -
Supreme Court allows Trump to restrict asylum seekers at border
20 minutes -
Europe’s heatwave shifts east as France raises health alert to highest level
21 minutes -
NPP NEC convenes to review internal reorganisation and election preparedness
23 minutes -
Upgrade report on 20 districts and 12 municipalities submitted for approval – Ahmed Ibrahim
26 minutes -
Inna Patty, Kafui Dey, Okyeame Kwame, Stacy Amoateng named judges for 69th Miss Ghana auditions
28 minutes -
AMA launches Waste Optimisation Strategy to drive source separation, composting, climate action
48 minutes -
500 nurses enrolled in new specialist training programme
51 minutes -
Heavy security deployed after Kasoa MCE, NDC officials storm Obaatanpa Radio
51 minutes -
Akofena is our new leader. He was not present at alleged shooting incident – KAMOG
1 hour -
Obaapanyin Lucy Ennin Arhinaraba Abeduwa
1 hour -
Elder Dr Samuel Kwesi Nkansah
1 hour -
Mrs Grace Opoku
1 hour -
I only received processed data – Former NSA Accountant distances himself from hire purchase list
2 hours