Audio By Carbonatix
The Northern Electricity Distribution Company (NEDCo) has apologised to customers in the Eastern Corridor following a total blackout on the evening of Saturday, September 21, 2024.
In a statement, NEDCo explained that the outage was caused by a burnt underground cable, which has complicated efforts to restore power quickly.
The company assured customers that their technical team is working hard to resolve the issue.

The blackout has left the entire Eastern Corridor without electricity, disrupting daily life and economic activities in the region.
NEDCo appealed to the public for patience as they continue to work on fixing the problem.
While the company acknowledged the inconvenience caused, no specific timeline was given for when power would be fully restored.
Latest Stories
-
Parliament hosts inaugural meeting of network of parliamentary training institutes with global partners
25 minutes -
OnlyFans owner Leonid Radvinsky dies at 43
5 hours -
Nigerian police arrest 15 after viral videos of alleged sexual assault at festival
6 hours -
Ethnic, political exclusion, not theology alone drives Muslim sectarian violence in Ghana, KNUST study finds
6 hours -
Semenyo reports to Black Stars camp after Carabao Cup win
7 hours -
Colombian military plane with 125 people crashes
7 hours -
Journalism out loud: Defending truth in a divided world
11 hours -
Heath Goldfields partners local firm, receives new mining fleet to revive Bogoso-Prestea mine
11 hours -
Korle-Bu overcrowding driven by broken referral system, not just bed shortage – Doctors
12 hours -
MC Portfolio named red carpet host for 2026 Ghana Music Awards USA
12 hours -
Oda-Akyem Swedru road develops dangerous potholes
12 hours -
U.S. Embassy explains Visa process for Ghanaians ahead of World Cup
12 hours -
Viral video on emergency care at Korle-Bu Teaching Hospital is ‘authentic’ – Emergency Medicine Residents
12 hours -
Ahmad Abdul-Samad, Rachael Quarcoo dominate 1st quarter All Ghana Badminton Championship
13 hours -
ActionAid calls for strong partnerships to advance water, gender, and climate justice
13 hours
