Audio By Carbonatix
The government has awarded a contract for the construction of three more culverts at the Fou Bridge to stop annual flooding in the area.
The contract was awarded to Insaan Ghana Limited.
Residents of over eight communities located across the bridge, face challenges crossing the bridge as a result of the perennial flooding in the area.
In some cases, farmlands and homes are affected. The flood destroys properties worth thousands of Ghana cedis.

The residents, who over the years, have petitioned the government to address the challenge, had their prayers answered earlier this year, when the Assembly awarded the contract.
This, however, did not bring the reprieve the townspeople sought.
According to residents, the bridge rather triggered an unprecedented flooding incident in the area on August 31, 2021.
Minister of Roads and Highways, Kwasi Amoako-Attah visited the area and promised some roads and drains would be redesigned and awarded for construction.

In that regard, the government has awarded the contract to Insaan Ghana Limited who is expected to work on the roads around the Kalpohin and Fou areas including the bridge.
A representative of Insaan Ghana Limited, Alhassan Iddrisu, said they would be constructing three major culverts and reconstructing the storm drain which is currently silted.
“They have added 3 by 3 culverts to be done at the Fou-Taha Bridge. There is one there that is silted which was supposed to be cleared but before that will be done, we will construct an outpour drain to come and connect to the silted bridge” he said.

Mr. Alhassan said the engineers have instructed that they expand the culverts.
“We will construct three of such bigger culverts, which is very large in such a way that it can contain all the outpour water that will come,” he said.
He explained that this will end the annual flooding in the area.
Mr. Alhassan said the contract includes construction of drains and road works along the Sanani and Fou area.
”We all know, when there is an intensive rain, everyone knows what happens around this area and as a result of that, we were fortunate to be awarded the project,” Mr. Alhassan said.
He said the project starts from the storm drain at Gumani linking to the cemetery area of Kalpohin, through the Global dream area, to the Oboye Azuman area, and then to the Fou/Taha bridge.

He said the project, which is expected to be completed in the next six months, is almost 85 percent complete.
”We plan to finish the project before the next rains” Mr. Alhassan added.
The representative of Insaan Ghana Limited said they are almost done with the drains with just a few meters left to be done.
”We have started the earthworks as well, we will soon finish with that and continue with the bitumen surfacing,” he said.
In appreciation of what the Minister for Roads and Highways has done for them, members of the community presented a bull to him.
Ismail Halid Abu who spoke on behalf of the community said this is the single largest project the area has ever benefited from any government.
He said every rainy season, the community is submerged and homes and farmlands are destroyed.
“We are so appreciative to the Minister for this project,” Mr. Abu said.
Latest Stories
-
South Africa pushes back against new US visa curbs
46 minutes -
Grand Theft Auto 6 soundtrack reveal revives digital release debate
57 minutes -
Charles ‘sounded giddily elated’ after Diana died, Earl Spencer claims
1 hour -
Samba with debut double as Man City thrash Norwich
1 hour -
Becham backs Messi for Ballon d’Or after 100th Miami goal
1 hour -
Real Madrid keen on Man Utd forward Gabriel, 15
2 hours -
Klopp wants to ‘reclaim’ flag amid German elections
2 hours -
FA chair demands Infantino release World Cup sell-off documents
2 hours -
Bournemouth on to win at Sociedad on European bow
2 hours -
U.S. Trade and Development Agency, C-Squared Africa sign deal to expand affordable digital connectivity in Ghana
2 hours -
We have at least 6 weeks of fuel cover – NPA boss calms supply fears
2 hours -
Fiji declares HIV a national emergency as cases surge
3 hours -
Michelin-starred Seoul restaurant fined for using ants as garnish
3 hours -
No politics behind fuel export reduction to Sahel – BOSTenergies
3 hours -
BOST clarifies fuel export cut to Burkina Faso, Mali – Says no imminent shortage in Ghana
3 hours