Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
UNFPA and partners triple fistula repairs but Ghana needs 2,249 a year to meet 2030 target
11 seconds -
Eastern Regional Fire Commander rallies officers to meet 2026 fire safety targets
5 minutes -
Bosomtwe STEM Girls SHS team returns to rousing welcome after World Robofest Championship feat
11 minutes -
Amin Adam warns against politicising banking regulation after GN Savings ruling
42 minutes -
GN Savings ruling poses fiscal and financial-stability risks – Amin Adam
52 minutes -
Amin Adam calls on BoG and Finance Ministry to explain implications of GN Savings ruling
1 hour -
Restoring GN Savings and Loans will be difficult after years of asset disposal — Dr Kweku Ndoum
1 hour -
Misrepresentation of GN Bank’s financial position led to collapse – Dr Kweku Nduom
1 hour -
Collapse of GN Bank led to loss of over 4,500 jobs — Dr Kweku Ndoum
1 hour -
Arrest and denial of bail being used to intimidate opposition voices — Egyapa Mercer
2 hours -
GN Savings & Loans: Banking sector clean-up could’ve been managed better – Bobby Banson
2 hours -
National Chief Imam urges Ghanaian pilgrims to uphold discipline and unity ahead of 2026 Hajj
2 hours -
Gov’t owed GN Bank GH¢300m in unpaid IPCs before reclassification and licence revocation — Dr Kweku Ndoum
2 hours -
Fernandes named Premier League player of season
2 hours -
BoG failed in its supervisory role in GN Bank crisis — Senyo Hosi
2 hours