Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
COPEC backs possible transport fare increase but warns of impact on commuters
23 seconds -
Dr. Nyaaba calls for sustainable transport and organic inputs to support farmers
13 minutes -
MTN Ghana to extend earnings into second-half of 2026; share price going for GH₵6.69
16 minutes -
Bono Region faces doctor shortage as only 7 of 20 posted doctors report – Deputy Health Minister
23 minutes -
Mahama to cut sod for 160-bed referral hospitals in Oti, Savannah and Western North
25 minutes -
Dr Kwame Nkrumah’s birthday celebration: Africa must heed Nkrumah’s vision of unity – Prof. Lumumba
27 minutes -
Dr Nyaaba calls for green financing to help farmers switch to solar-powered irrigation
27 minutes -
Investor sentiment towards banking stocks to remain positive
32 minutes -
Ghana’s happiness index averages 4.70 as study flags concerns over governance, environment
32 minutes -
Parents urged to seek early treatment for childhood cancer
34 minutes -
AngloGold Ashanti Obuasi mine promotes inclusion through neurodiversity awareness programme
34 minutes -
TVET Service warns institutions against unauthorised fees during admissions
37 minutes -
Paramount settles lawsuit with US states, clearing way for $110bn merger with Warner Bros
38 minutes -
GIRSAL calls for affordable financing and technical support for Ghana’s smallholder farmers
38 minutes -
Kwame Danso 24-hour economy market project five percent complete – Minister demands improvement
39 minutes