Audio By Carbonatix
The Lavender Hill and Mudor Faecal Treatment Plant under the management of Sewage Systems Ghana Limited (SSGL) in Accra, has been enjoying high patronage since full operation began in January, this year.
The facility, which has the capacity to receive 80 per cent of the entire human waste generated in Accra, is currently receiving between 200 and 250 trucks of human waste daily.

"Patronage of the facility is so impressive that we are currently putting in place measures to contain more of the human waste brought into the plant," Ms Lola Asiseh Ashitey, the Business Development and Communications Manager for Sewage Systems Ghana Limited (SSGL) said in an interview with the Daily Graphic in Accra.
The $80 million plant has a well-equipped laboratory, a 5,500 cubic metre tank and a machine for odour control, among other facilities.

Management determined
Ms Ashitey said since full operation began, management had put in place measures to ensure that the facility was able to deal properly with the faecal waste brought to the centre daily.
She said the facility had been positioned well and adequately resourced to manage 80 per cent of the entire faecal waste generated in the region.

“We have in place the equipment and the human resources to efficiently manage the over 200 trucks of waste the facility receives daily," Ms Ashitey said.
She said the Lavender Hill and Mudor Faecal Treatment Plant is the biggest among the three facilities being managed by the company in Accra.
"This facility serves the Accra Central Business District, Osu, Ministries, Cantonments, High Street and some portions of Labone," she added.

Explaining the difference between Lavender Hill and Mudor Treatment Plant from another Lavender Plant which shared the same location, Ms Ashitey said “our plant fully treats both liquid and solid waste.
“The other facility separates liquid from solid and tries to benefit from the solid to generate compost, while the liquid is discharged into the sea untreated. But our facility treats both solid and liquid waste to get the best out of them,” she said.

According to Ms Ashitey, the Lavender Hill and Mudor Treatment Plant was built to meet the Environmental Protection Agency (EPA) standards,” she said.
Challenges
Throwing light on some of the challenges the facility had faced so far, Ms Ashitey said apart of the fact that most of the human waste brought to the plant had in them discarded materials, the facility is managing its challenges.

"Most of the human waste brought to the plant had in them foreign materials, including jeans, shirt, polythene bags. We, therefore, have to spend time and resources to separate them because the Plant only manages human waste," she said.
Ms Ashitey urged the public to manage their septic tank well by avoiding putting inside of them materials that would not allow for easy processing.
Latest Stories
-
Public prophecy can attract legal action if harm is caused—Lawyer
2 minutes -
NPP accuses government of authoritarian tactics
3 minutes -
NPA slashes Fuel Price Floor for April 16 window; petrol now GH¢13.27, diesel at GH¢16.10
3 minutes -
COPEC pushes for partial fuel tax cuts to ease burden on Ghanaians
7 minutes -
Guinness Ghana to award GH¢100,000 to winner of 2026 TGMA Album of the Year
16 minutes -
Accra hosts Africa workshop on civilian protection from explosive weapons
19 minutes -
IMF recommends strengthening of BoG’s macroprudential framework
32 minutes -
Banking sector records gradual recovery but NPLs, sovereign exposures remain high – IMF
35 minutes -
When algorithms decide the story: AI and the new struggle for press freedom
42 minutes -
GRA sharpens frontline capacity to drive tax compliance and boost national revenue
45 minutes -
UG Corporate Football League Week 7: Goals, drama and hat-tricks on display
1 hour -
South Africa names apartheid-era politician as new ambassador to the US
1 hour -
Asante Kotoko apologise for ‘disappointing’ form, vow to hire ‘competent’ coach
1 hour -
Tema daycare reopens after microlight aircraft crash
2 hours -
Free Primary Healthcare to remove cost barriers — NHIA CEO
2 hours