Audio By Carbonatix
The Ghana Water Company Limited (GWCL) has announced that engineers will be working on the main transmission pipeline from the Kpong Treatment Plant to the eastern part of Accra.
For this reason, the management of GWCL in a press statement, revealed that there will be an interruption in water supply from Sunday 24th September to Thursday 28th September 2023.
Affected areas include Gbetsile, Afienya, Zenu, Prampram, Mataheko, Katamanso, Dawhenya, Sakumono, Batsonaa, Klagon, Tema Township, Adjei Kojo, Borteyman, Santeo and surrounding areas.
The GWCL urged residents of these communities to store enough water during the period in which the works will be carried out.
GWCL, however, assured that the water supply will resume as soon as the works are completed.
This forms part of GWCL's effort to rehabilitate its faulty pipelines. This repair work, the company added, will also reduce the inconvenience of frequent interruption of supply to customers and ensure a long-term reliability of water supply.
"In April 2021, the GWCL announced to the public, that the main 42-inch transmission pipeline was weak and as a result gave way frequently due to the high volumes and pressure in the pipeline thereby making the company lose a lot of water and revenue."
"The works involved in changing the pipeline is capital intensive, therefore, Management has resolved to change the weak portions of the line to reduce cost and to maintain the integrity of the transmission pipeline," the company noted.
Below is the statement from GWCL
As part of efforts to rehabilitate the main transmission pipeline from the Kpong Treatment Plant to the eastern part of Accra, the Management of Ghana Water Company Limited (GWCL) wishes to bring to the notice of the public, especially our valued customers being served by the Kpong Treatment Plant, that there will be an interruption in water supply from Sunday 24th September to Thursday 28th September, 2023 to enable engineers of GWCL work on the transmission pipeline.
In April 2021, the GWCL announced to the public, that the main 42-inch transmission pipeline was weak and as a result gave way frequently due to the high volumes and pressure in the pipeline thereby making the company lose a lot of water and revenue.
The works involved in changing the pipeline is capital intensive, therefore, Management has resolved to change the weak portions of the line to reduce cost and to maintain the integrity of the transmission pipeline. This repair work will also reduce the inconvenience of frequent interruption of supply to customers and to ensure a long-term reliability of water supply.
Areas to be affected:
The areas that will be affected by this exercise include Gbetsile, Afienya, Zenu, Prampram, Mataheko, Katamanso, Dawhenya, Sakumono, Batsonaa, Klagon, Tema Township, Adjei Kojo, Borteyman, Santeo and surrounding areas.
Management is therefore entreating customers in the above-stated areas to store enough water during the period in which the works will be carried out. The public and essential service providers are entreated to contact the following numbers for enquiries and alternative supply: 0800 40000 (Toll Free on Vodafone Lines) 0302 2218240, 0207385089, 0207385090 and via Whatsapp lines: 0555123393 & 0555155524.
Management also assures customers that water supply will resume as soon as the works are completed. The inconvenience this may cause is deeply regretted.
Latest Stories
-
Motorists and pedestrians decry worsening encroachment on roads and pavements in Avenor
9 minutes -
Mexico beat South Africa in dramatic World Cup opener as three players sent off
54 minutes -
Gov’t releases GH¢537m to cover tuition fees of 159,750 students under No Fees Stress Policy
58 minutes -
Twice in a year, Chairman Wontumi’s lead lawyer has walked away
2 hours -
CSOs mount strong defence of OSP ahead of Supreme Court verdict
2 hours -
Telecel launches Ashanti Codes to equip youth with digital and AI skills
2 hours -
Cash for awards controversy: Minority demands parliamentary inquiry
3 hours -
Abronye DC granted permission to travel to UK for master’s programme
3 hours -
Government has stabilised economy, jobs will follow — Ricketts-Hagan
3 hours -
World Cup ticket allocations for Ghanaian diaspora not yet received -UN Mission
3 hours -
PURC, ECG and GRIDCo align plans to ensure stable power supply during 2026 FIFA World Cup
4 hours -
Ghana launches National Shea Commodity Platform to commercialise shea production
4 hours -
Bawumia holds talks with British High Commissioner in Accra
4 hours -
AFF study documents 115 edible forest species and indigenous knowledge in biodiversity hotspot
4 hours -
Fortune names Yellow Card among top global crypto innovators
4 hours