Audio By Carbonatix
The Electricity Company of Ghana (ECG) has failed to meet the ultimatum to provide a load-shedding timetable.
The deadline was provided by the Public Utilities Regulatory Commission (PURC) following the incessant power outages.
The Commission had instructed the ECG to submit a comprehensive report covering the period from January 1, 2024, to the present date.
This was supposed to also outline the volume of load curtailed for each outage incident, energy not served, and the number of customers affected.
The Commission had given the ECG a seven-day deadline to furnish them with the required information.
However, despite the stipulated timeframe, the ECG has failed to comply with the PURC's request.
Failure to respond to these key issues may result in sanctions being imposed on the power distribution company, as warned by the PURC.
Latest Stories
-
Four suspects arrested in fatal kidnapping attempt near Chereponi
24 minutes -
Sankofa Pan-African Committee honours Temple of Rabbi leader as ‘Custodian of Peace’
29 minutes -
Obuasi Trade Show records high turn-out and strong impact
44 minutes -
‘Obroni wawu’ – The paradise of waste: Where Charity becomes a curse
59 minutes -
38 arrested in intelligence-led police operations across parts of Tema Region
1 hour -
Experts say missing engine part in most Ghanaian vehicles polluting air, sickening people
2 hours -
India express train kills seven elephants crossing tracks
2 hours -
Gunmen kill nine in South Africa tavern attack
2 hours -
Charting a New Course for National Prosperity: Why an open ship registry can anchor Ghana’s twenty-four-hour economy vision
3 hours -
Ghana Airways restoration key to national pride and economic reset – Ablakwa Â
3 hours -
US seizes second oil tanker off Venezuela’s coast
3 hours -
Australian PM announces intelligence review as country mourns Bondi attack
3 hours -
Imran Khan and wife given further jail terms after state gift fraud case
4 hours -
5 perish in fatal collision on Cape Coast–Takoradi Highway
4 hours -
Sing Traditional Area marks 10 years of reign of youngest paramount queenmother
4 hours
