Audio By Carbonatix
The technical fault at the Aboadze Thermal Plant which led to prolonged bouts of power outage in some parts of the country has been rectified.
The Director of Thermal Generation at the Plant, Mr Steve Doku, made this known to the Ghanaian Times on Tuesday.
He explained that the parts had been procured on Monday ahead of the fault, and added that the problem was fixed by 4 pm on Tuesday.
He, therefore, gave the assurance that with the rectification of the problem, the Aboadze Thermal Plant was now operating on full stream.
Last Sunday’s fault resulted in a 110-megawatts power trip, leading to unscheduled power outages. It caused inconveniences to the public that has had to endure a load shedding regime since August last year.
An earlier announcement by the Volta River Authority and Electricity Company of Ghana that one of the two Gas turbines at the Aboadze Plant had developed a problem that would take about a week to solve, raised anxiety among the public.
The statement painted a grim picture, when it said the situation had resulted in a shortfall, which could not be catered for with power from the Akosombo dam, which is running on two out of six turbines.
Credit: Ghanaian Times
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Ghana’s fishers hold the knowledge, why are they not shaping policy?
13 minutes -
Two killed and many injured after car driven into crowd in German city of Leipzig
14 minutes -
GNFS honours firefighters on International Firefighters’ Day 2026
16 minutes -
Kasapreko PLC announces GH¢700million IPO on Ghana Stock Exchange
22 minutes -
NIA resumes Ghana Card registration for children in Volta and Oti Regions
26 minutes -
Handling of BoG 2025 report risks politicisation – Oppong Nkrumah
27 minutes -
Health Ministry partners with World Bank Group to tackle regional health challenges
30 minutes -
IGP deploys intelligence officers, anti-armed robbery unit to Bono East, Northern regions after deadly attacks
36 minutes -
BECE logistics delays in rural areas not unusual – Kofi Asare
37 minutes -
5 police officers interdicted over misconduct in viral videos
44 minutes -
Hindsight: How Ghana’s relay team was sabotaged by Sports Ministry and Ghana Athletics
52 minutes -
Mahama to host world leaders on global reparatory justice at Accra summit
54 minutes -
When partnerships become problems: Rethinking Nestlé’s role in Ghana
1 hour -
World Relays 2026: Saminu clarifies remarks on Ghana 4x100m team preparation, calls for unity ahead of major competitions
1 hour -
Heath Goldfields clears GH¢139 million in worker arrears as Bogoso-Prestea recovery begins
2 hours