Audio By Carbonatix
Even before the newly refurbished edifice for use as offices for parliamentarians is handed over, the Job 600 is reported to be showing signs of decay.
Members of Parliament (MPs) are therefore questioning the quality of work done on the structure expected to accommodate the over 200 MPs. The legislators have raised serious concerns about the quality of materials used and work done on the building.
According to Joy News’ Parliamentary correspondent, Elton John Brobbey, some visible fittings including balustrades which have began decaying were discovered by members of Parliament’s Works and Housing Committee on Wednesday, when they toured the premises to ascertain the extent of work done.
He reports the site engineer, Bensti Enchill, attributes the poor state of the structure to its proximity to the sea. Renovation works on the edifice popularly known as JOB 600 began in 2007.
The site engineer reportedly gave the edifice, a rating of “fair” when Chair of the Parliamentary sub-committee on housing demanded his expert opinion on the state of the structure.
The engineer was however unable to give a set time for completion of work on the legislative office block. The Contractor has since been asked to replace the deteriorating fittings with quality materials.
Parliament goes on recess today and members are expected to resume business in mid May.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Stay loyal despite frustrations over contracts — Asiedu Nketia to NDC supporters
16 minutes -
Possible power outages loom as Akosombo substation repairs continue – Deputy Energy Minister
21 minutes -
GETFund injects GH¢ 400m into KNUST Teaching Hospital project
25 minutes -
Support traditional leadership for peace and development – Otumfuo
26 minutes -
No campaign can secure victory better than unity – Asiedu Nketia
30 minutes -
Manhyia is home to whoever swears allegiance to the people – Otumfuo
34 minutes -
Asiedu Nketiah commissions new NDC Zonal offices in Wa East
35 minutes -
Ghana Gas pushes for tariff increase to sustain operations and future investment
35 minutes -
Ghana launches standards to boost local grinding media manufacturing
37 minutes -
Africa urged to shift from climate positions to action
42 minutes -
Stakeholders affirm need for election of MMDCEs
51 minutes -
Mankrong-Nkwanta gets new chief
53 minutes -
Malaria deaths drop sharply; infections remain high- GHSÂ
55 minutes -
TUC calls for unity among organised labour
1 hour -
Ghana begins airlifting Hajj pilgrims on May 1
1 hour