
Audio By Carbonatix
President Nana Akufo-Addo will today, Thursday July 6, 2017, symbolically turn the production valve on the Floating Production Storage and Offloading Vessel (FPSO) John Agyekum Kufuor to officially commence production of oil in commercial quantities from the Sankofa Gye-Nyame Fields.
The ceremony which will be held offshore on the FPSO will have the President opening a Subsea Well Choke and unveiling a plaque to commemorate the ceremonial event.
It will be followed by a grand durbar of chiefs, Government officials and other dignitaries at the Takoradi Shorebase in the Western Region.
Eni is the operator of the OCTP block with a 44.44% stake, while Vitol holds 35.56% and Ghana National Petroleum Corporation (GNPC) 20%.
The OCTP integrated oil and gas development is made up of the Sankofa Main, Sankofa East and Gye-Nyame fields, which are located about 60 kilometers off Ghana’s Western Region coast.
The fields have cumulatively, recoverable reserves of about 1.07 TCF of gas, 173 million barrels of oil and about 30 million barrels of condensate.
The fields would produce altogether 45,000 BOPD of oil and 170MMSCFD through 18 wells using the floating production, storage and offloading unit (FPSO) John Agyekum Kufuor.
A 63-kilometer submarine pipeline will transport gas to Sanzule's Onshore Receiving Facilities (ORF), where it will be received and transmitted for power generation.
The OCTP Project has achieved significant local content development and participation with the fabrication of module stools, risers, jumpers, among others, in Ghana.
Latest Stories
-
Absa Bank empowers Persons with Disabilities through financial literacy programme
11 minutes -
Joyce Bawah Mogtari calls for collective responsibility to tackle flooding and waste management challenges
22 minutes -
Agbodza warns contractors against using weather as excuse for road project delays
39 minutes -
Ghana Reference Rate rises to 10.59% in July, signalling possible increase in lending rates
41 minutes -
Asiedu Nketia urges Africa to move beyond raw material exports through industrialisation
43 minutes -
Contractor delaying Weija Paediatric Hospital handover, not government – Health Minister
45 minutes -
Auditor-General has recovered nearly GH¢12bn in disallowed expenditure in 2024 – PAC Chair
47 minutes -
Roads Minister urges contractors to adopt on-site design reviews to avoid project delays
47 minutes -
Agbodza criticises highways officials over failure to report delayed road projects
48 minutes -
Government approves rehabilitation of Achimota School roads ahead of centenary celebrations
52 minutes -
‘It’s been tough’ – Opare Addo says gov’t needed 18 months to understand youth jobs crisis
52 minutes -
Energy Minister engages AGI on strengthening partnership to support industry
56 minutes -
Bawah Mogtari urges Ghanaians to turn flood crisis into opportunity for sustainable sanitation practices
58 minutes -
Three KMA officers injured as residents resist demolition exercise in Kumasi
1 hour -
Youth Ministry found ‘fragmented’ gov’t programmes holding back jobs – George Opare Addo
1 hour