Audio By Carbonatix
Twitter has started to roll out a new interface for its web users that includes several key features, like a newly designed emoji button.
The most important changes are tiny shortcuts to make tweeting easier. A large, dedicated button in the tweet box makes it easier to add an emoji, an updated trending section appears on the right-hand side of the page, and little aesthetic updates make it easier to see who’s involved in a conversation.
These changes, alongside the way Twitter’s desktop version has condensed from three columns into two, should make it easier to both read and send tweets.
None of these changes are part of Twitter’s previously announced updates.
Beta testing for several new Twitter features, including status updates and reply functionality, hasn’t started yet.
It’s unclear how many people will be able to opt in to the new desktop version of Twitter, but those who can be presented with the option to do so. The Verge has reached out to Twitter for more information about a broader rollout.
Latest Stories
-
Joana Quaye’s legal team dismisses ex-husband’s allegations as “untrue”
31 seconds -
Energy Minister orders regular updates on power restoration following Akosombo substation fire
2 minutes -
Procurement fraud risks deepen value losses in consumer and industrial products and services industry
4 minutes -
Washington hotel shooting raises questions about Trump security
5 minutes -
Gov’t reaffirms commitment to reliable power supply amid ongoing disruptions – Energy Minister
5 minutes -
Jennifer Mendelewitsch: Kudus is ‘the one who is being punished the most’ after split
6 minutes -
Gov’t to construct new transmission line to resolve low voltage Issues in Volta and Oti – Jinapor
10 minutes -
GRIDCo to begin major transmission reinforcement works in Kumasi to boost power supply
16 minutes -
ECG to publish short-interval outage updates as Akosombo restoration remains fluid
17 minutes -
Ghana’s power sector remains resilient despite recent disruptions – Energy Minister
19 minutes -
‘Family pressured Kudus to cut ties with me’ – Ex-agent alleges
23 minutes -
Full Text: Energy Minister’s presentation on power challenges after Akosombo substation fire
26 minutes -
“We’ll not live in denial” over power challenges following Akosombo fire – Jinapor
28 minutes -
Akosombo fire damaged control room responsible for power evacuation – John Jinapor
32 minutes -
Energy Minister details power sector reforms, explains Akosombo substation fire and assures restoration
40 minutes