The Ministry of Roads and Highways through the Ghana Highway Authority (GHA) in a press release says a section of the N4 (Tetteh-Quarshie - Koforidua) highway will experience minimum to maximum disruptions to traffic flow.
This, according to the statement, is to allow GRIDCo to undertake the stringing of transmission line conductors along the stretch of the highway.
The exercise follows a total power system shutdown which the Ghana Grid Company (GRIDCo) has attributed to a technical fault on one of the major transmission lines between Tetteh Quarshie and Koforidua.
The exercise is said to take effect from Saturday, May 8 to Sunday, May 9th, 2021, between the hours 8am - 12noon daily.
Road users have been advised to follow the traffic diversion signs that will be placed at the various sections on the N1, N2 and N4.
"Motorists/Commuters are kindly advised to follow the traffic diversion signs to be placed at the
various sections on the N4 (Okponglo, near McDan Offices, La -Bawaleshi and East Legon)."
Latest Stories
-
Ghana leads charge in promoting African cuisines on the global stage
2 mins -
Music industry lacks peace since I joined – Davido
3 mins -
Consumer financial education: Demystifying personal loan structure
8 mins -
Ejisu by-election: Voting underway
23 mins -
Africa can only attract development finance with sustainable debts – Seth Terkper
25 mins -
Today’s front pages: Tuesday, April 30, 2024
26 mins -
ReFinD initiative funds 17 projects to boost digital financial inclusion
29 mins -
I’m not a front-runner to be Bawumia’s running mate, says Bryan Acheampong
37 mins -
Mobile money sales boy accused of over GH¢1.3m theft – Court awaits AG’s direction
52 mins -
EC’s stolen BVR kits, laptops: One granted bail, three still on remand
59 mins -
Dela Seade assumes role as CEO for Black Sheep Foundation
1 hour -
West Africa Food Festival uniting the continent – Africa Chefs Alliance President
2 hours -
Over 40 health facilities completed under Akufo-Addo’s tenure, Okoe-Boye reveals
2 hours -
Reflect integrity, become problem solvers – Graduates told
2 hours -
ILO Valuation Report based on assumptions – SSNIT
2 hours