Audio By Carbonatix
Volta Regional Minister, Dr. Archibald Yao Letsa has said that he is impressed by the progress of work on the UHAS-Titrinu bypass being constructed by the First Sky Group.
The project, being undertaken by the First Sky Group Limited, according to Dr. Letsa, after completion, will help reduce traffic in and out of the main Ho town, which includes the UHAS internal roads.
Speaking during an inspection tour of the roads, Dr. Letsa noted that the progress made is very satisfying, especially with the level of work done so far on the designated areas by the contractor.

"I am very much impressed about the progress of work done so far on the UHAS-Titrinu bypass and the UHAS internal roads and I believe they will meet the deadline of completion, because I know what they can do," Dr. Letsa said
The Regional Minister is hopeful that the heavy traffic experienced by motorists in town, will reduce drastically and economic activities in those areas will improve when the project is complete.
Meanwhile, the Volta Regional Director for Urban Roads, Mr. Edward Kwame Annan in an interview with the media during the inspection tour noted that works on the roundabouts at Gborgame, UHAS, Catholic Secretariat are yet to be completed and should not be used while work is ongoing.

Mr. Annan said the Urban Roads Department is working on some traffic management interventions on the UHAS-Titrinu bypass and the dual carriageway.
Residents in the area are optimistic that the completion of the road would help improve their businesses as many drivers using the road as well as students would patronise their wares.
The construction works include Earthworks, road pavement works, concrete U drains of varying sizes, lay-bys, and walkways.

Installation of Traffic Signs, Traffic Signals, Street Lights, and Road Markings.
Work on the UHAS-Titrinu bypass is expected to be completed in November, this year.
The UHAS internal road is 5.3 kilometres whereas the UHAS-Titrinu road is 5.2 kilometres.
Latest Stories
-
Sam George lauds coordinated crackdown on cybercrime in Tabora and Lashibi
4 minutes -
100 arrested in Accra’s Tabora in major Mobile Money fraud crackdown
8 minutes -
BOG put GH¢4.69bn into gold-for-oil, lost over GH¢2.1bn with no impact — Audits show
26 minutes -
CRC opted for broader reforms over abolishing ex-gratia – Charlotte Osei
43 minutes -
Mahama’s record shows four-year presidential term is sufficient – Inusah Fuseini
50 minutes -
Four-year term enough for accountability – Inusah Fuseini
57 minutes -
CRC Proposals: We were very mindful not to create problems while solving existing ones – Charlotte Osei
1 hour -
Ebo Noah’s ‘faith’ or Climate Change: Rains on Christmas eve and day in Ghana?
1 hour -
Dr Seidu Jasaw commissions CHPS facilities in Chaggu-Paala and Tuosa communities
2 hours -
Charlotte Osei describes CRC work as “a privilege of a lifetime”
2 hours -
Ablakwa inaugurates SMART classrooms for STEM education
2 hours -
Livestream: Newsfile discusses Constitution review report and AG’s ORAL drive
3 hours -
Michael Adangba Legacy Music Festival pulls huge crowd for maiden edition
3 hours -
MTN spreads Christmas cheer to newborns in Takoradi hospitals
3 hours -
Kumawu MP celebrates Christmas with drivers and riders
4 hours
