Audio By Carbonatix
The Municipal Chief Executive (MCE) for Juaben in the Ashanti Region, Omane Aboagye, has inspected work on a section of the Kubease-Nkyerepoaso road in the Juaben Municipality.
The inspection, according to the MCE, was to access first-hand information about the progress of work.
Mr. Omane Aboagye, after the inspection, advised the contractor working on the project to desist from doing shoddy work but ensure the building of durable roads that will stand the test of time.
He also charged project consultant as well as Assembly Members to effectively monitor the project and ensure quality materials are used to meet its expected life span.

The MCE said the 21-kilometre road is considered as one of the key projects because it connects to major cocoa growing communities in the municipality.
The road, when completed, would connect Kubease-Nkyerepoaso route to Juaben to help ease heavy traffic on the Kubease-Anita Hotel junction.
This, he said is also expected to help farmers on that route to transport their produce to the market centre.

Explaining the progress of the work on the road, the Project Foreman at Prestige Company Limited, Anthony Sarfo, assured the MCE of using quality materials for the project.
He is confident to complete the road within a 12-month duration to ensure smooth commuting.
Latest Stories
-
La Beach demolition: Senyo Hosi condemns lack of consultation
7 minutes -
Russian glide bomb attack on Zaporizhzhia kills at least 15 people
22 minutes -
Jinapor warns underperforming energy sector CEOs of consequences, says no protection for failure
23 minutes -
Fire destroys head of tipper truck on Lower Volta Bridge
28 minutes -
Palmer signs new Chelsea contract until 2034
29 minutes -
World Cup visa scandal: Mahama will act on corruption allegations – Abass Nurudeen
31 minutes -
Abass Nurudeen accuses Minority of ‘scandal scavenging’ over World Cup visa controversy
33 minutes -
US Embassy recognised NSA, GFA and GTA as separate entities for visa applications – Sports Minister’s aide
39 minutes -
Only 30% of Ghanaian teachers satisfied with their jobs – CAPCOE data reveals
50 minutes -
Communities affected by construction of Akosombo Dam urge government to speed up compensation process
1 hour -
World Cup visa scandal: Sports Ministry not shielding anyone – Sports Minister’s special aide
2 hours -
World Cup visa scandal: Over 30 people misrepresented as GTA board members to US Embassy – Vincent Assafuah alleges
2 hours -
Fire destroys wooden structure near Yesu Mo Villa at Bush Road
2 hours -
NDC threatens sanctions over oversized campaign posters, gives aspirants 5 days to comply
2 hours -
Star Oil paid GH¢2.7bn in taxes, levies in nine months of 2026
3 hours