Audio By Carbonatix
A Japanese power company restarted a nuclear reactor this week, the first to come back online since a March earthquake and tsunami in the nation.
The March 11 disasters sparked a nuclear crisis and a backlash that postponed plans to reopen reactors shut down because of damage, inspections or unrelated technical problems.
Kyushu Electric Power Co. said it has started generating electricity from the No. 4 reactor late Tuesday at the Genkai nuclear power plant in western Japan.
The reactor was taken offline in October after technical problems.
Company officials won approval from a local governor and a mayor to bring the reactor online, Japan's Kyodo news agency reported.
Nuclear safety critics criticized the reopening, with the power company receiving more than 200 calls Tuesday from citizens who opposed the move.
Another power company said it may have suffered a setback in its efforts to handle damaged nuclear reactors.
Tokyo Electric Power Co. said Wednesday it detected the chemical element xenon in a nuclear reactor at the crippled Fukushima Daiichi nuclear power plant, a sign that nuclear fission may have occurred.
The power company said it began injecting boric acid into the cooling system and has not seen a temperature change that would suggest nuclear fission has occurred.
The reactor, No. 2, was one of several damaged in the wake of the historic March 11 disaster.
Recently, Japanese officials said it may take 30 years to decommission the four damaged reactors at the power plant.
A draft report, released by Japan's Atomic Energy Commission of the Cabinet Office last week, said the removal of debris -- or nuclear fuel -- should begin by the end of 2021.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
CSIR warns Ghana’s soil health is deteriorating, calls for urgent national action
7 minutes -
Two feared swept away after River Agyei overflows Kasoa–Domeabra road
11 minutes -
Tony Elumelu appointed chairman of Seplat Energy
24 minutes -
Education Minister raises alarm over indiscipline in SHSs, announces national reform conference
26 minutes -
Lom Ahlijah advocates tech-based monitoring in schools after assault case
30 minutes -
UTAG threatens nationwide strike over delay in book and research allowance rate
38 minutes -
Boundary Commission urges border residents to protect boundary pillars and support national security
41 minutes -
Ghana to grow at 5.0% GDP in 2026, but faces huge investment financing gap – AfDB
42 minutes -
Deputy AG, 14 CSOs appear at Supreme Court for hearing on challenge to OSP’s prosecutorial powers
47 minutes -
Minority MPs meet Ghana High Commissioner to Canada to discuss diaspora welfare and bilateral relations
56 minutes -
GNAT threatens WASSCE boycott over detained Nyinahin SHS teacher
1 hour -
Free SHS: Education Minister hails end of school food shortages
1 hour -
NLA Director-General calls for a concerted effort in fight against illegal gambling
1 hour -
74% of returned Ghanaians had overstayed visas – South Africa’s Int’l Relations Minister
1 hour -
Ghana’s National Vaccine Institute joins WHO-backed Global Clinical Trials Forum
1 hour