Audio By Carbonatix
The Roads Minister has assured the people of Volta region that, by the end of the first term of the Akufo-Addo regime the entire stretch of the Eastern Corridor Road would have been completed.
Kwasi Amoako Atta described the Eastern Corridor Road as being of great importance since it is the shortest route between the Southern sector and the Northern sector of the country.
Eastern Corridor Road is the linkage between 5 regions, i.e. Greater Accra, Eastern, Ashanti, Volta, and Upper East.
Mr Amoako Atta was speaking at Hohoe on Tuesday where he addressed Chiefs from South Dayi, North Dayi, Ho, Ho West, Kpando, Hohoe and Afadjato South, on day 2 of President Akufo-Addo’s 3-day tour of the Volta Region.
With seven different contractors having been awarded different contracts on different sections of the road, the Roads Minister noted that the Eastern Corridor road has had a chequered history.
He explained that COCOBOD is funding the Have – Hohoe Lots 1&2 (51.3km), and Hohoe – Jasikan (32km) stretches of the road. These sections have run into difficulties, as payments by COCOBOD have been suspended.
The section from Dodo Pepesu to Nkwanta was funded by an EU loan of a little over 320 million euros, which was worked on by Djibril Kanazoe, a renowned Burkinabe contractor.

“That Dodo Pepesu to Nkwanta road is in a very terrible, worse condition. The other sections, which are being worked on by other contractors, suffered delayed payments and were abandoned,” Amoako-Atta said.
He assured that the government is working very hard to work on the entire Eastern Corridor stretch to make it motorable.
“We have, therefore, packaged the areas that have never been done. We have put those areas under a facility called Sinohydro facility, and these areas cover the areas of Have to Hohoe and from Oti-Damanko to Gbinitri (168km). All the others are being repackaged, and arrangements are being made to send all the six contractors back to work,” he assured.
Mr Amoako Atta also assured the Chiefs and people of the Volta Region that “from now onwards, you are going to see and witness for yourselves, a renewed effort that will be sustained to work on the Eastern Corridor.”
He added, “It is the determination of the President, that by the end of the first term, the entire stretch of the Eastern Corridor will see the light of day, and I want to assure that it is receiving the attention of government.”
Additionally, the Roads Minister indicated that his Ministry is also working on many of the roads in the Volta Region, with roads in the Hohoe township also receiving particular attention.
“I am happy to inform you that, within the Hohoe area, five of your roads have been selected, and within the next 2 months, contractors are mobilising and will come to the site. Be assured that your roads are receiving the attention, just as any other roads in our country,” he added.
Latest Stories
-
2028 presidential talk ‘a betrayal of the cause’ — Vice President shuts down NDC flagbearer discussions
12 minutes -
Senegal court jails three TikTok influencers for insulting the president
57 minutes -
This Saturday on Prime Insight: Ministerial reshuffle, democracy debate take centre stage
1 hour -
Hunter Biden says his pardon was ‘not good’ for America or his father’s legacy
2 hours -
Ghana EXIM Bank’s 10th anniversary CSR project transforms Hogbe Park into a modern astro turf facility
3 hours -
Kenneth Adjei embraces new defence role, pledges ‘renewed energy’
3 hours -
This Saturday on Newsfile: NPP politics, police bribery, helicopter disaster, and ECG crisis
3 hours -
Serial sex offender guilty of double murder and rape
3 hours -
Spain to impose border controls against Italy as row over Ceuta migrant influx intensifies
4 hours -
Gender Minister monitors LEAP enrolment exercise in Savelugu, Kumbungu
4 hours -
Luv FM High School Debate: Twenty schools get set to battle for 2026 crown
4 hours -
Gender Minister begins Northern Region tour to monitor LEAP enrolment exercise
5 hours -
Patchbay Band to share their story on E Vibes this August
5 hours -
GAUA resumes nationwide strike over pay disparities
5 hours -
Defence Minister-designate Adjei must prioritise GAF personnel welfare — KAIPTC lecturer
5 hours