Audio By Carbonatix
Eni has launched production from the Integrated Oil and Gas Development Project, in the Offshore Cape Three Points (OCTP) block, off Ghana’s western coast, in just two and a half years, and three months ahead of schedule, reaching another record time-to-market.
The OCTP integrated oil and gas development is made up of the Sankofa Main, Sankofa East and Gye-Nyame fields, which are located about 60 kilometers off Ghana’s Western Region coast. The fields have about 770 million barrel of oil equivalent (mboe) in place, of which 500 million barrels of oil and 270 mboe of non-associated gas (about 40 billion cubic meters). The project includes the development of gas fields whose production will be utilized entirely by Ghana’s domestic market.
Production will be carried out via the “John Agyekum Kufuor” floating production, storage and offloading unit (FPSO), which will produce up to 85,000 barrels of oil equivalent per day (boepd) through 18 underwater wells. A 63-kilometer submarine pipeline will transport gas to Sanzule's Onshore Receiving Facilities (ORF), where it will be processed and transmitted to Ghana’s national grid, supplying approximately 180 million standard cubic feet per day (mmscfd).
"Starting production only two and a half years after the approval of the Development Plan is an extraordinary result and a reason for great pride. It certifies our exploration skills and knowledge, as well as our field development vision, and it confirms the effectiveness of our new operational model, where Eni has a central role in project management, aimed at improving time-to-market," said Eni CEO Claudio Descalzi. "This is a result we are especially proud of, because it fits perfectly into the joint development vision that we have for Africa: we grow when the countries that host us also grow. The launch of OCTP will provide gas to Ghana for over 15 years and the resulting electricity will give a real boost to the country’s development. All of this has only been possible thanks to the unwavering commitment of Ghanaian authorities and of our partners."
Eni is operator of the OCTP block with a 44.44% stake, while Vitol holds 35.56% and Ghana National Petroleum Corporation (GNPC) 20%.
Eni has been present in Ghana since 2009 through its subsidiary Eni Ghana, and with the startup of OCTP Integrated Oil and Gas Development Project the Company has become one of Ghana’s main operators. In 2016, Eni obtained a new exploration license, Cape Three Points Block 4, adjacent to the OCTP Block. If successful, synergies with OCTP will allow for a fast-tracked start-up. The drilling of the first exploration well is expected in 2018, in continuity with the drilling of Block OCTP wells. In addition, Eni Ghana is exploring development opportunities in the renewable energies sector. Eni Foundation also has an important social and health program in the Western Region, benefiting a population of over 300,000 people.
Latest Stories
-
Ghanaian among 20 arrested as 306 stolen vehicles recovered in Canada
14 minutes -
Neither Russia nor France: One West African country walks a diplomatic tightrope
31 minutes -
Former CSA boss says he was politically insulated to do his job
42 minutes -
NAPO slams gov’t for revocation of renamed universities
49 minutes -
Playback: The Law discussed legal backbone of Ghana’s cybersecurity framework
2 hours -
Photos: 2025 Diaspora Summit
2 hours -
Diaspora partnership central to Ghana’s reset agenda – Vice President
2 hours -
Ghanaian graduate students in U.S. appeal for financial support to complete studies
2 hours -
Four suspects arrested in fatal kidnapping attempt near Chereponi
3 hours -
Sankofa Pan-African Committee honours Temple of Rabbi leader as ‘Custodian of Peace’
3 hours -
Obuasi Trade Show records high turn-out and strong impact
4 hours -
‘Obroni wawu’ – The paradise of waste: Where Charity becomes a curse
4 hours -
38 arrested in intelligence-led police operations across parts of Tema Region
4 hours -
Experts say missing engine part in most Ghanaian vehicles polluting air, sickening people
5 hours -
India express train kills seven elephants crossing tracks
5 hours
