
Audio By Carbonatix
Government is to demolish all illegal structures that are hindering the smooth construction of the East-West Water Interconnectivity Project linking the Weija Reservoir to the Legon
Booster Station.
Mr Abubakar Saddique Boniface Minister for Water Resources, Works and Housing who announced this on Monday said that although work is ongoing, illegal structures are hindering the progress of work.
“People are refusing to vacate the catchment areas where pipes are supposed to be laid despite the advanced notice. These people are preventing about three million people from getting access to potable water,” he lamented.
The Accra East-West Project is expected to solve the perennial water problem within the Ga West of the Greater Accra Region serving areas such as Okponglo, Madina, Abokobi, Kwabenya, Ashongman, Ashaley Botwe and their environs.
Touring some water project sites in Accra on Monday, Mr Saddique said government would not be lenient with any trespasser as far as the project was concerned.
He said everything would be done to ensure that the project was completed
in October this year adding, “government is aware of the difficulty the people in the Madina, Domi-Kwabeya, Taifa and other areas go through in accessing potable water.”
The Minister visited water pipe laying sites at Abokobi, Madina, and Akweteman to inspect the progress of work on the Ga East-West water interconnectivity.
Mr Boniface said the country needed to produce about 150 million gallons of water a day to meet the demands of the population as of now.
Professor Mike Ocquaye, Member of Parliament for Domi-Kwabenya, who joined the inspection team said people in his Constituency had not been able to have potable water since the 1980`s.
He said, “The people would be relived of the water problems that we are facing us when the project is completed.
Mr Raymond Pinkney, Manager of Ballast Nedam Limited, the company implementing the project said about 60 per cent of the laying of pipe in the communities had been completed.
He explained that water from Kpong reservoir was not able to serve residents in Madina, Oponglo, Legon, Tema and its surroundings so the alternative means of serving them was to draw water produced at Weija to those residents.Source: GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
SIMS executive urges community banks, fintechs to partner for deeper financial inclusion
14 minutes -
NPP beats NDC with 49% support in new APL national vote tracker
17 minutes -
Business incubators as a de-Risking tool for SME financing in Ghana
19 minutes -
Why Ghana can’t ignore plastic pollution and marine litter: A World Ocean Day reflection
26 minutes -
Ghana’s economy set for 5.9-6.1% growth in 2026 despite Middle East tensions – Standard Bank Research
30 minutes -
Kennedy Agyapong’s statements undermine NPP’s good name – Ahiagbah
46 minutes -
I will not rest until Bawumia becomes Ghana’s President in 2028 – Wontumi
49 minutes -
Ignore the distractions – Sammi Awuku urges Bawumia
52 minutes -
NCPTA backs GES ban on extravagant graduation ceremonies in basic schools
55 minutes -
Bibiani NPP coordinators demand resignation of Western North Regional Chairman over mass disqualification
58 minutes -
UTAG gives government June 30 deadline to resolve welfare issues or face strike
1 hour -
Ghana’s non-traditional exports exceed $5bn mark
1 hour -
Stanbic Bank rewards FIFA World Cup winners and launches new Visa local card usage initiative
1 hour -
Handicrafts sector records 500% growth in exports – GEPA
1 hour -
Emirates expands operations in Ghana with additional weekly flights
1 hour