Audio By Carbonatix
The Public Utility Regulatory Commission (PURC) has said the GHC60,000 it is demanding for the cost of drilling one borehole in some selected communities in Ghana is legitimate.
Director of Public Affairs for the Commission, Nana Yaa Gyantuah said the integrated nature of the planned project dictated the cost.
She expressed shock over what she said was the attempt by some individuals to compare apples to oranges.
The boreholes would have an electronic panel to power them which is different from the ones drilled in various homes, she told Dzifa Bampoh, host of Joy FM’s Top Story programme Tuesday.
She also explained the boreholes are gritted water system which involved some geophysical studies and would be fitted with a pump house which would help community members to access the water.
The opposition New Patriotic Party (NPP) at a news conference in Accra Tuesday registered its disappointment in what it said was an attempt to redirect public funds to sponsor the campaign of the governing National Democratic Congress (NDC).
NPP former General Secretary, Kwadwo Owusu Afriyie who addressed the media read a letter in which the PURC has demanded GHC60,000 each for the drilling of 500 boreholes in some selected communities across the country.
According to him, the party's interaction with some industry players revealed the standard cost of drilling a borehole is GHC18,000 and not the one the PURC quoted.
This, he said, is a clear case of government colluding with a national institution to siphon millions of funds to sponsor President John Mahama's campaign.
Another issue, he said the NPP found baffling was the decision of the utility regulator to use sole sourcing in awarding such a competitive contract.
The Party believes this is unhealthy for the country especially the rate at which contracts are handed out on sole sourcing basis.
However, the PURC said the GHC18,000 the NPP claimed to be the prevailing cost in the country does not come with some of the equipment the GHC60,000 borehole benefits from.
Nana Yaa Gyantuah also said the PURC decided to use the single sourcing system because of its past experiences.
She said the Commission awarded some contracts to companies that performed well during the tendering process but later ended up with poor work.
"PPP has given approval but the PURC has not awarded the contract. If anything is going to happen the project will start in 2017 January," she said.
Latest Stories
-
South Tongu MP supports Dorkploame D.A. Basic School with GH¢16,200 for rehabilitation
9 seconds -
Hamas confirms top commander killed in Israeli air strike
11 minutes -
Photos: Inside the 2026 JoyNews Impact Makers Awards at Labadi Beach Hotel
14 minutes -
Ghana’s Commonwealth Games participation in limbo over gov’t’s reluctance to release funds
16 minutes -
Senior IS leader killed in joint operation, US and Nigeria say
35 minutes -
Tens of thousands descend on London for rival protests
35 minutes -
Trump warns Taiwan against declaring independence, hours after summit with China’s Xi
36 minutes -
WHO intensifies response as Ebola outbreak kills dozens in DR Congo
38 minutes -
Free speech is being protected under Mahama — SIF CEO rebuts Bawumia’s claims
48 minutes -
Nine injured in Sefwi Awaso road crash
57 minutes -
Was the IMF Programme derailed? – Facts show 2015 Programme was off-track, not 2023 Programme
59 minutes -
Teach your children truth, not comfort – FDA Director shares life lessons on motherhood and survival
1 hour -
Ghana must take control of mining sector, but not through abrupt policy shifts – Kenneth Ashigbey
1 hour -
Let’s not throw away IEA proposal to nationalise mining assets – Prof Bokpin urges
1 hour -
Ayoub Group donates motorbikes to Nima Police to boost security operations
2 hours