Audio By Carbonatix
A state of the art Seawater Pumping Station Project, built by Technofab Engineering Limited (TEL), an Indian Company, was on Saturday handed over to the Tema Oil Refinery at a ceremony in Tema.
It took TEL 27 months to complete the 12.6 million dollar project which was contracted to it in April 2007.
It consists of the pumping station and a new fiberglass pipeline to replace the existing concrete bonna pipe, installed over 45 years ago.
The pipeline which is approximately 5.5 kilometres in length stretches from the Tema fishing harbour to the refinery, made of fiberglass, a material resistant to seawater corrosion.
Recounting the history of the project, Dr Kwame Ampofo, Acting Managing Director of TOR, said in March 2005, fire destroyed the then existing seawater pumping station which served the refinery.
Dr. Ampofo said after the loss of the pump station, the refinery resorted to the use of municipal water for its operations, which he said was very expensive.
He said as a result, Management thought it wise to re-install the seawater pumping station, in order not only to have sufficient water available for firefighting, but to also hydrotest newly constructed storage tanks, and flash wash pipelines.
The ultimate objective, he said, is to improve the refinery’s risk profile, thereby reducing the insurance premium on its assets.
Mr O. N. Vij, Senior Vice President of TEL, who handed over the project to TOR, hoped it would serve its intended purpose.
Source: GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Government to add constitutional referendum to 2027 District Assembly elections
39 minutes -
Government disburses GH¢23.1 billion to clear road contractors’ arrears – Roads Minister
1 hour -
NPP Ashanti elections: 1,020 delegates to choose 11 regional executives
2 hours -
Galamsey: ‘Challenge is prosecution, not arrest’ — Lands Minister
3 hours -
MTN to build 80 new sites across the five regions of the north as part of a $1.1bn investment
4 hours -
The Polygamist’s creator says women see themselves reflected in her Netflix hit
5 hours -
UEW Hospital suspends OPD services over GAUA strike
5 hours -
Muzic Mensah selected for Boomplay’s inaugural ‘NEXT WAVE’ Programme
6 hours -
Prime Insight to tackle legal vacation controversy and $1million AKSA bribery case
6 hours -
Ghanaian evacuee from South Africa dies on arrival in Accra
7 hours -
Suicide and the fight to stay alive
7 hours -
POS Foundation raises alarm over student cohabitation, sexual harassment on university campuses
8 hours -
Nandom NPP primary heats up as four candidates enter 2028 race
8 hours -
Mangione admits killing healthcare CEO and pleads guilty to federal charges
8 hours -
The Invite to The Odyssey: 12 of the best films of 2026 so far
9 hours