Audio By Carbonatix
The Management of Tema Oil Refinery has constructed a new operational tanker park at the cost of nine billion cedis to relocate tanker drivers.
The measure is to ensure absolute safety of lives and properties.
The park, located about 200 metres away from the refinery is equipped with facilities such as 60 offices for the Oil Marketing Companies (OMC), sanitary facilities, training centres for the drivers, bathrooms, fire fighting equipment, generator, 12 fire fighting hydrants, water reservoir, offices for the drivers, canteens and sleeping rooms, among others.
The tankers, presently numbering about 1,500 were being parked at the frontage of the refinery and along the street.
Taking newsmen round to inspect the park, Mr Robert Mosore, Manager in-charge of Special Duties at TOR said the area had a capacity for 400 tankers who would be waiting for their turn to load their fuel allocation and then leave the premises immediately for their respective destinations.
The rest of the tankers would be at their respective areas across the countryside and would be informed through the OMC when to load before coming to wait at the park.
That would ensure that no tanker would have to waste time loading their consignment.
Mr Mosore explained that the refinery's business was threatened by fire outbreaks with the tankers parking area from both loaded and unloaded trucks.
These were mainly caused by the siphoning of products leading to generation of static ignition, insecurity of vehicles due to the operations of intruders, popularly known as the "belle belle boys", while operations of the neighbouring companies also posed threat hence the construction of the park.
He said keeping the tankers at the safe and confined place would eliminate siphoning of fuel from loaded trucks, ease congestion on the TOR-VALCO road and bring together all the OMC at one place.
Mr Mosore however, indicated that ejection of traditional food sellers along the street posed a threat as they are adamant to leave but said they would liaise with the Tema Municipal Assembly to resolve the situation.
Talking about emission of smoke from nearby Ferro Fabrik Company, he said the Company is addressing the situation with the help of the Environmental Protection Agency.
Source GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
MTN Ghana webinar urges SMEs to get financial discipline right
32 minutes -
Duvor Klu, Hua crowned champions as J30 Accra Week 1 concludes
45 minutes -
Gov’t to make rural telephony services cheaper by first quarter of 2027 – Sam George
1 hour -
National Chief Imam remains Ghana’s strongest symbol of interfaith harmony – Mahama Ayariga
1 hour -
Gov’t to upgrade all rural telephony networks to 4G capability – Sam George
2 hours -
‘We’ve never seen a CJ in our judiciary system who is everywhere like MTN’ – Janet Nabla
2 hours -
Lawyers, prosecutors fume over abandoned 26-year-old Upper West High court project
2 hours -
At least two dead in blast at Bolivia military barracks
2 hours -
Tate brothers officially indicted with trafficking and sex crimes in Romania
2 hours -
US envoys arrive in Moscow ahead of Ukraine talks
2 hours -
Health Minister to brief media on Free Primary Healthcare programme on Monday
3 hours -
‘It was inappropriate to make that comparison’ – Dr Pumpuni Asante on CJ’s SOE comment
3 hours -
Photos: Final-day shopping continues at Joy FM Back-to-School Discount Fair
3 hours -
Darkey and Frimpong set up J30 Accra boys’ doubles final
3 hours -
When war takes more than territory: The human cost of conflict
3 hours