Audio By Carbonatix
This letter article is situated within the context of the flooding that began on October 9, 2023, which is associated with VRA standard operations of spilling excess water to safeguard the integrity of the Akosombo and Kpong Hydropower dam.
On Wednesday, October 5, 2022, hundreds of houses were reported submerged at Oblogo, Tetegu, New Weija, SCC, Tatop, Sampa valley parts of Top Town and American Farm at Ngleshie Amanfro following the opening of the Spill gates of the Weija Dam by the Ghana Water Company Limited (GWCL) which caused the destruction of vehicles, home appliances and personal effects running into millions of Ghana Cedis.
A year on, on October 9, 2023, an even stronger flooding is reported at downstream communities specifically, South, Central and North Tongu, Shai Osudoku, Anlo, Ada East and Asuogyaman after the double-stage spillage of the Akosombo and Kpong Hydropower facilities by the Volta River Authority (VRA) which effect on life and property is not dissimilar from the GWCL spillage in 2022.
In order to strengthen infrastructure monitoring for flood risk reduction in the face of changing global environment associated with climate variability, a three-step solution is recommended.
One strengthened collaboration between the Water Resources Commission (WRC), The Ghana Meteorological Agency (GMET) and The Hydrological Services Authority (HSA) to build an Integrated Hydro Informatics Management System (IHIMS) on future Climate Scenario Models and System Dynamics for qualitative and quantitative monitoring and data analysis.
This requires a basin-wide installation of stream gauge networks and sensors. Then two data exchange between upstream riparian regions and their activities on the system, then three granting water infrastructure institutions system access.
A Flood Early Warning System could be a sub-component within the larger IHIMS. This will strengthen our flood emergency preparedness through the collection of quality data, analysis and forecasts to minimize the scale of damage going forward.
We hope the floods will go away but experience has shown that it is here to stay. So, we need to strengthen our adaptability for an improved disaster management.
Thank you.
About the author; Ing. Mark Benyah is a Water Resources Development and Management Consultant. Email: nakmaben@gmail.com
Latest Stories
-
Pay teacher allowances to improve student performance – Ntim Fordjour urges gov’t
2 hours -
Why Alonso’s chances of survival at Real Madrid are slim
2 hours -
Legal Green Association launches scholarship scheme for law students
2 hours -
Simon Madjie writes: Oti Region: Ghana’s emerging growth frontier
3 hours -
Cedi slips amid seasonal heat; one dollar equals GH¢12.20
3 hours -
Yirenkyi-Addo wins ‘Deloitte CEO Impact Award’
3 hours -
‘I am not weak’ says Slot, but Salah could return
3 hours -
World Bank’s new outcome bond supports clean cooking initiative in Ghana
3 hours -
NACOC nabs 3 in connection with 1,158kg suspected cocaine shipment to Belgium
3 hours -
‘Certiorari is not stay of execution’: Amaliba defends Parliament’s notification on Kpandai vacancy
3 hours -
Sister Sandy set to host Medikal’s BYK Concert at the Accra Sports Stadium
4 hours -
AfroFuture Ghana 2025 adds Rema, KiDi and more to its December festival lineup
4 hours -
Paramount launches rival bid for Warner Bros Discovery
4 hours -
Ukraine’s European allies press for more security guarantees
5 hours -
Why the haste? – NPP MP question’s EC notification over vacant Kpandai seat despite stay of exection
5 hours
