Audio By Carbonatix
The Electricity Company of Ghana (ECG) is installing new Automatic Meter Reading (AMR) devices at all telecommunication cell sites in the Volta Region.
The move forms part of the power distributor’s drive to safeguard the integrity of all its meter installations and promote transparency in its dealings with customers.
The AMR meters are smart meters equipped with a mobile data SIM card, which enables both the ECG and a customer to monitor the energy inflow, and the customer’s real time consumption.
The ECG has so far installed the new AMRs at 170 of a total of 270 teleco cell sites in the region.
The cell site metering project is a partnership between the ECG and the telecommunication companies in Ghana.
The ECG provides the meters while the telcos provide cables and other materials needed for the installations.
The Volta Regional commercial manager of ECG, Sylvester Abrefah-Besea praised the partnership between the telcos and ECG, leading to the successful roll out of the project.
He revealed that the telcos will be able to monitor their consumption and other activities on the meter, through a web application they will be granted access to.
“Our field officers often had problems gaining access to read the meters at most cell sites because these facilities are under lock and key. Now, even before we print out the monthly bills, a customer can know what he has consumed by the click of a button” he said. He added that “the AMR meter has an alarm system that will immediately trigger when anyone tampers with it or tries to engage in an illegality,” he said.
In a related development, the ECG has installed a net-meter at Ho Polytechnic radio station, Volta Premier FM.
The installation of the meter follows the successful completion of a 10KW grid-tied solar photovoltaic system by the station.
The net-meter will allow excess power generated by the station’s solar system to be fed into the national grid for use by other customers of ECG.
Without a net-meter, the feeding back of the excess solar power would be regarded as consumption and the station, billed for it.
“These recent smart meter installations show the new direction the company is heading”, the Volta Regional General Manager of the ECG, Ing. Joseph Forson said.
He stressed that “the ECG aims to consolidate the many gains made over the past year, and seal any loopholes through the introduction of the latest technology”. Ing. Forson told the company’s customers.
Latest Stories
-
District court issues warrant for arrest of Mark Benyin for unlawful entry, electronic record interference
48 seconds -
2 killed, 8 injured in Dompoase road crash near Komenda
5 minutes -
From brain drain to continuity gain: How a national intelligence layer can turn global African experience into national intelligence
8 minutes -
BECE’s relevance has diminished under Free SHS – EduWatch
14 minutes -
Laud Nartey Writes: The role of the Bank of Ghana in the indigenisation of mines
15 minutes -
MTN records pre-tax profit of GH¢7.4bn in half-year 2026
16 minutes -
A road of death, a trail of promises: How Ghana failed the Accra-Kumasi Highway
21 minutes -
Big Ghun to lead mobile filmmaking workshops in Germany and Ghana
26 minutes -
NACSA extends gun violence prevention campaign to Ayawaso North Municipality
26 minutes -
‘Vibes The Movie’ wins Ghana Comedy Awards Best Comic Film honour
29 minutes -
President Mahama calls for honest teaching of slavery’s legacy
30 minutes -
WAEC officials present in fewer than 10% of BECE centres – EduWatch
31 minutes -
Kofi Hayford urges SHS graduates to “dream, pursue and achieve” at Heritage Christian University mentorship programme
32 minutes -
Minority calls for urgent completion of Accra-Kumasi Highway after fatal Birimso Bridge accidentÂ
33 minutes -
Pokuase Interchange toilet facility is government project, not private development – Ga North MCE
34 minutes