Audio By Carbonatix
President John Dramani Mahama says Ghanaians must be ready to pay more for electricity if they genuinely want reliable, sustainable power.
Speaking on Kumasi- based Garden City Radio; the president said the cost of electricity will go up because the country will rely more on thermal power which is more expensive than hydropower.
“If we do not want dumsor and we genuinely want reliable sustainable power, then we should be ready to pay more and that is the reality,” he said
Ghana has been experiencing erratic power supply for many years now. Authorities have attributed the situation to the lowering level of water in the various hydro dams and the piecemeal natural gas supply from Nigeria.
President John Dramani said there is a worrying signal that hydropower which is cheaper is no longer going to be reliable.
“We might have to shut down four units and rely on only two because of the water level at Akosombo,” he stated.
According to him, (500MWs) of Akosombo is off and the Dam is just four feet above the minimum operating feet.
The President blamed the situation partly on climate change.
“Normally by this time this year the water level at Akosombo Dam should be between 155-160ft but it could not get to that level because of lack of rains this year”, he explained.
President Mahama also said pipelines are being laid from West to East to pipe gas from Ghana Gas to Tema to power the five to six plants when there is no gas from Nigeria.
WAPCo threatened to cut gas supply to Ghana by Friday, October 16 if Ghana failed to settle over $180 million debt owed the Nigeria-based gas supplier, N-Gas.
It took the intervention of a high-level government delegation led by Power Minister Kwabena Donkor to get WAPCo defer its decision.
President Mahama said, the debt was incurred in 2012 when the gas pipeline that transported the gas got burst. This forced VRA to buy light crude oil for more than one year and that affected VRA’s balance sheet after the gas supply resumed.
According to him, there was an arrangement with Nigeria to pre-finance the gas supply over a period of time and that VRA was going to keep up with current payments.
“We have paid up to July and we owe only for September and as I speak with you, NMPC Boss is on his way to Ghana,” he stated.
Latest Stories
-
The World Cup and the new geography of belonging
42 minutes -
World Cup 2026: The Stars that were a kick away from a semi-final 16 years ago, arrive in USA not as standard-bearers
52 minutes -
Sky Train trial: $2m loss was caused by Covid-19, defence lawyers argue
1 hour -
Petrol prices set for sharpest drop in months as fuel costs fall from June 16
1 hour -
Vehicle pollution, a leading risk factor for death in Ghana both the children and working class
1 hour -
GNFS intensifies fire prevention campaigns in Eastern Region
2 hours -
Presidency cuts political appointees by 124, but compensation bill jumps 148% and staff classifications raise questions
2 hours -
Retirees benefit from 7th health screening of Lordina Foundation
2 hours -
Sogakope residents storm ECG office over alleged overbilling, poor service delivery
2 hours -
BoG extends registration deadline for money transfer operators
2 hours -
Esiama Market to become commercial hub of Ellembelle – Kofi Buah
2 hours -
Black Stars to depart Rhode Island for Toronto today ahead of Panama clash on Wednesday
2 hours -
Wenchi 24-Hour Market project takes shape
2 hours -
Suaman MP urges NPP members to rally behind Dr Bawumia for victory 2028
2 hours -
Auditors’ Court to be established to prosecute audit offences – Ato Forson
2 hours