Audio By Carbonatix
Minister of Energy and Petroleum, Emmanuel Armah Kofi Buah, has revealed that government would use its share of their Millennium Challenge Account (MCA) to procure thermal plants to boost the nation’s energy generation.
“The reason why we are focusing the MCA funding on the energy sector is that we know that and we have talked about it that we have to focus on bringing more thermal generation to ensure that we have insurance against a possible shortfall in supply from Akosombo,” he noted.
The Millennium Challenge Account (MCA) is a bilateral US development assistance program announced by President Bush in March 2002.
The objective of the MCA is to help support economic growth and poverty reduction in the poorest countries in the world.
The Compact was signed on August 1, 2006 at an impressive ceremony at the State Department in Washington, DC and was worth $547,009,000 million dollars.
This fund, helped in improving agriculture and the construction of feeder and trunk roads across the country.
The country is expected to start accessing the second phase of the fund which is around $565 million dollars around January,2015.
Currently, the backbone of energy generation relies on the generation of hydro power from Akosombo, Bui and thermal generation from the Aboadze thermal station.
Due to inadequate water to sustain adequate hydro generation and shortage of crude oil and gas from suppliers, the nation was plunged into incessant power crisis.
This problem, ushered in the load-shedding program which in effect shut down several businesses prematurely.
During last year, President John Mahama vowed to curb the crisis before the end of that year but the issue proved elusive as it still persists.
Despite the energy crisis, the Minister was optimistic that upon the procurement of the thermal plants and with assistance from the hydro generation, the nation’s erratic energy crisis will be resolved.
“I think that we are monitoring because if u see the rains this year we are on a path where we will probably get out of it,” he believed.
A $220 million Kpone thermal plant which is expected to add 220MW[mega watts] of power to the national grid is expected to be completed by the end of this year.
Latest Stories
-
Mahama’s gov’t isn’t against OSP – Deputy AG
17 minutes -
Ghanaians building alcohol tolerance through excess drinking – Prof Calys-Tagoe
18 minutes -
‘World Cup is not a small thing’ – Adu Kwabena targets Black Stars squad place
20 minutes -
Only constitutional amendment can fix OSP problem – Deputy AG
20 minutes -
Ghana’s Damang Mine and the new economics of sovereign mining: Why Engineers & Planners signals a strategic inflection point
21 minutes -
Excess alcohol consumption raising cancer risk in Ghana – Prof Calys-Tagoe
31 minutes -
AG must avoid curtailing OSP mandate – Mary Addah
39 minutes -
OSP can’t prosecute independently under constitution – Twum-Barimah
41 minutes -
Sucking a woman’s breast does not prevent cancer – Prof Calys-Tagoe
44 minutes -
Business community fails to secure suspension of ‘Publican AI’ system after finance ministry meeting
1 hour -
Mfantsipim at 150: A model for the future of Ghanaian education
1 hour -
Africa Economic Forum pushes African-Led economic control agenda
2 hours -
Trade Minister visits MND Metals, affirms government’s industrialisation drive
2 hours -
Today’s Front pages: Friday, April 17, 2026
2 hours -
Ghana’s Free Visa Policy: Big idea, mixed reactions, and a shared duty to inform
2 hours