
Audio By Carbonatix
The Ghana Grid Company is warning of an impending disruption to power supply as a result of technical challenges at the West Africa Gas Pipeline Company.The technical challenges have affected the supply of gas to the Volta River Authority and caused a shutdown of the Sunon Asogli Power Plant.GRIDCO in a statement said it has requested the Electricity Company of Ghana and the Northern Electricity Distribution Company to implement a load-shedding programme in some parts of the country.The statement adds that engineers of the pipeline company are working to resolve the problem and that normal power supply will be restored as soon as the problem is resolved.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Ghana close to issuing forest carbon credits under J-REDD+ programme – Minister
4 minutes -
I returned to Ghana to make a difference in healthcare — Dr Naa Ashietey
35 minutes -
Ghana Music Awards USA 2026 partners with WatsUp TV to amplify Ghanaian music
38 minutes -
Utility companies should fix their losses, not pass to consumers – AGI
41 minutes -
AI and the future of Jobs: Ghana’s AI Strategy and opportunities for youth action
1 hour -
Ghana scores 22 out of 100 on budget transparency, raising accountability concerns
1 hour -
Sentuo Oil Refinery expansion to create 1,500 jobs, boost energy security – John Jinapor
1 hour -
Adwoa Safo: JoyNews at sickbed of injured former Dome-Kwabenya MP
1 hour -
Partey wins JAC Motors MVP award after performance in Black Stars draw with England
2 hours -
GES PRO urges GTEC to publish accredited institutions instead of focusing on unaccredited schools
2 hours -
WASSCE candidate who died after final paper identified as 18-year-old Notre Dame SHS student
2 hours -
Sentuo Oil Refinery capacity to increase from 40,000 to 100,000 barrels per day – Energy Minister
2 hours -
GTEC list of unrecognised institutions in Ghana: Doxa, Debest, Faith University among 70+ flagged
2 hours -
Unilever. Guinness. FanMilk. Kasapreko beat them all
2 hours -
Trump asks Congress for $87.6bn for Iran war after Republican showdown
2 hours