Audio By Carbonatix
The Director-General of the National Roads Authority (NRA), James Amoo-Gottfried, says the increase in the cost of constructing the well-known Flower Pot Interchange along the Spintex Road in the Greater Accra Region is due to an expanded scope of work.
According to him, the original work plan has changed, leading to the rise in costs.
“The initial scope was entirely different. It was to involve two overpasses: one over the Flower Pot roundabout and another across the motorway (Accra-Tema Motorway), totalling about 120 metres of bridge length. What we have now is about 1,022 metres of bridge length,” he explained.
“So, the scope as originally planned and what we have now is entirely different ” he said on Joy FM's Super Morning Show on Wednesday, November 20.
Mr Amu’s clarification comes in response to a call by the Minority Members of Parliament (MPs) for an explanation regarding the increase in construction costs.
Read also: Flower Pot Interchange: Explain how a GH¢69m project shot up to GH¢700m – Minority to gov’t
The Flower Pot Interchange project was awarded in 2016 for GH¢69.5 million by the previous NDC government. However, the project cost was revised to GH¢147 million in 2017 and has now neared GH¢1 billion under the Nana-Addo government.
It is one of the major infrastructure projects prioritised by the NPP government in the heart of the capital.
On Tuesday, President Nana Addo Dankwa Akufo-Addo commissioned the project.
This infrastructure aims to ease traffic congestion on the north and south corridors of the Tema Motorway, enhancing connectivity and improving travel times for commuters.
Read also: Flower Pot Interchange will ease traffic, but congestion may persist – Urban Roads director
The Flower Pot Interchange features an 802-metre dual carriageway viaduct with asphaltic concrete surfacing, a 140-metre ramp from Shiashie onto the viaduct towards Airport Hills, and an 80-metre ramp connecting the viaduct to the motorway towards Tema.
Latest Stories
-
Gov’t may review fuel taxes amid rising oil prices – Kwakye Ofosu
5 minutes -
Iran–US conflict pushes fertilizer prices higher, raising food security risks in 2026
10 minutes -
Iran using children in security roles in war, reports and witnesses say
13 minutes -
Evalue-Ajomoro-Gwira MP pledges to safeguard peace in Lower Axim and Nsein
17 minutes -
Global collaboration in focus as Malaysia courts Ghanaian top business executives
25 minutes -
Evalue Ajomoro Gwira MP calls for calm amid Lower Axim and Nsein chieftaincy tensions
38 minutes -
I know the President listens and he will – Franklin Cudjoe
58 minutes -
Former AG Godfred Dame demands retraction from Kwakye Ofosu over galamsey claims
58 minutes -
All Big Push contractors paid, projects on track – Roads Minister
1 hour -
Photos: Mahama meets CSOs on accountability, anti-corruption and governance
1 hour -
Big Push prioritises precision, quality and value – Roads Minister Agbodza
1 hour -
Big Push agenda targets local contractor development – Agbodza
1 hour -
Between memory and partnership: Ghana’s moral test on reparatory justice
2 hours -
“OSP has always lacked the opportunity to speak” – Samuel Appiah-Darko
2 hours -
Local experts unlock pension capital as Ci Gaba Fund raises GH¢380m to finance SMEs
2 hours
