Audio By Carbonatix
A recently commissioned road in the Volta region described by President John Mahama as "one of the best quality roads" in Ghana has developed potholes.
The Nkwanta South DCE Alfred Kofi Wukanye told Joy News regional correspondent Hubert Mawuli Yevu-Agbi he has had cause to complain to the regional minister about the Kankyakura- Gbadago stretch of the road.

Joy News checks found at least nine potholes and developing potholes on the Dodo Pepesu-Nkwanta road built at a cost of €25.9 million.
During the April 19, 2016, commissioning, President John Mahama was full of praise for the Burkinabe contractor, Djibril Kanazoe.
“I also want to take the opportunity to thank Messrs Oumarou Kanazoe Contractors Limited of Burkina Faso for the very high quality of work they have done on this stretch of road. As I have said, perhaps, this is one of the best quality roads in Ghana today and I will urge the Minister of Road and Highways to bring other contractors to come and see so that they can emulate it in other parts of the country.”
But since the commissioning, Joy News investigations by Manasseh Azure has found that President John Mahama received a Ford Expedition gift valued at $100,000 from the Burkinabe contractor in 2012.
The revelations have put the government under scrutiny and the road has become the latest issue of public interest.
While large sections of the road appear to be in good shape, there are spots on Kankyakura- Gbadago section showing that the bitumen surface is eroding, revealing a sandy strata.


According to the DCE Alfred Kofi Wukanye some sections of the road need “serious engineering”. He explained that the regional minister has forwarded concerns to the Ghana Highway Authority.
The Authority has assured the minister it will be inspecting the road to ascertain the extent of the repairs needed.
A driver told Joy News’ “we use the road in the night so if the potholes become bigger it will disturb our driving”.
Until the construction, the road was a prohibitive route especially when it rains.


The "quality" of Kanazoe's work on this road was one of the main reasons the Burkinabe was being offered an 82 million cedi 28- kilometre road contract on the Wa-Nandom Hamile stretch in the Upper West Region.
The contract was being offered to Kanazoe on sole-sourcing but following the revelation by Manasseh Azure Awuni, the Roads and Highways Minister, Inusah Fuseini, announced that the contractor had pulled out of the deal. He did not give any reason.
Latest Stories
-
Asiedu Nketiah says he will declare presidential ambition ‘when the time is up’
40 minutes -
You cannot hide your ambition and expect people to vote for you – Asiedu Nketiah’s 2028 Message
1 hour -
I won’t declare NDC Chairmanship re-election bid before internal elections – Asiedu Nketia
1 hour -
I have never ruled any position out – Asiedu Nketiah keeps presidential ambition alive
1 hour -
Ghana needs fixed campaign periods to reduce election distractions – Asiedu Nketia
2 hours -
Asiedu Nketiah brushes off Haruna Iddrissu’s ‘proper Thank-You Tour’ jab
2 hours -
I’d be a stupid Chairman if I sat idle – Asiedu Nketiah defends Thank-You Tour
2 hours -
Asiedu Nketia calls for state funding of party primaries, says 2014 one-member-one-vote exercise cost GH¢14m
2 hours -
I don’t need a Thank-You Tour to sell myself – Asiedu Nketiah rejects presidential agenda claims
2 hours -
One year is enough to replace delegates system with one-member-one-vote – Asiedu Nketia
2 hours -
Mahama addresses the joint sitting of Jamaican Lower/Upper Houses in Kingston
3 hours -
Mahama pays tribute to Marcus Mosiah Garvey in Jamaica
3 hours -
Magistrate court remands two over alleged murder of suspected burglar
3 hours -
GoldBod hasn’t lost GHS200m; Dominic Bonsu was never my bodyguard — Sammy Gyamfi rebukes Kofi Bentil
3 hours -
Why should gov’t choose 3 candidates for us? – John Darko rejects MMDCE selection model
3 hours