Audio By Carbonatix
The largest wetland area in the heart of the Sekondi Takoradi metropolis, the Butua Lagoon, is under serious threat as the city is overwhelmed by investors looking for land to site their businesses.
A 5.7-acre wetland has already been reclaimed by oil company UBI Energy.
The company has so far cleared the land and is getting ready to install tank storage bladders for petroleum products without the requisite environmental permit.
This has angered the Western Regional office of the Environmental Protection Agency as the agency has issued an enforcement notice ordering UBI Energy to stop developing the area.
The Butua Lagoon and Wetland is located adjacent the Takoradi Polytechnic off the Sekondi-Takoradi highway.
Together with the Monkey Hills, the area can be developed into a major eco-tourist site.
Wetlands function as water filters, reservoirs, blood regulators, habitat for numerous fish, wildlife and recreational area for people.
But without any form of permit from the EPA and other relevant agencies, UBI Energy has already reclaimed 5.7 acres of the wetlands to build tanks to store petroleum products.
The company defied several warnings and enforcement notices served it by the EPA, an engineer with the EPA in Takoradi, George Kwame Diawuo, told Joy News.
The Metropolitan Chief Executive of Sekondi-Takoradi, Kwamena Annan Pra tells Joy news the place is not actually a wetland.
“The assembly has no hand in that development. The people have applied for temporary permit which we have not given,” the MCE said.
Company officials have declined comment.
Story by Kwaku Owusu Peprah
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
AMA says Konkomba traders were consulted ahead of Agbogbloshie 24-hour market project
16 minutes -
Let’s pilot Chinese in public schools before scaling up – EduWatch
25 minutes -
Ghanaian tech professionals develop SMS-based AI tool for non-smartphones
1 hour -
MTN@30: Three customers drive away brand-new Land Cruiser Prado in Kumasi
1 hour -
If BOST made GH¢684m profit, why use NPA Bill 2026 to weaken it? – IERPP questions Gov’t
1 hour -
NPP alleges executive, administrative confusion over Arabic, Chinese language policy
1 hour -
Minority accuses AMA of targeting Konkomba Yam Market in planned demolition over 24-hour market
2 hours -
Ghana struggles to raise local funds for delayed cocoa season as investors demand higher returns
2 hours -
GSA delays laboratory equipment replacement despite available funds
2 hours -
IERPP calls for withdrawal of proposed NPA Bill, raises concerns over BOST mandate
2 hours -
We’re not demolishing Konkomba Yam Market – Accra Mayor dismisses Minority’s claims
2 hours -
Nitiwul, Accra Mayor clash over Konkomba Yam Market demolition for 24-Hour-Economy market
3 hours -
BoG urges digital asset businesses to build compliance into operations at Digital Assets Summit Africa
3 hours -
NGIS Money Market Fund’s net assets rise 33.3% to GH¢11.78m
3 hours -
Vaglas join Vughin to mark Dɛng Festival of Sonyor in Savannah Region
3 hours