Audio By Carbonatix
The Director of Advocacy and Policy Engagement at the Ghana Center for Democratic Development (CCD-Ghana), says the country is not equipped with a well-designed verification system that tracks projects carried out by the government.
Dr Kojo Pumpuni Asante said the data needed by independent institutions to verify these projects is not readily available, and as such relies on the reports of people to ascertain what has been done.
Speaking on NewsFile, Dr Asante stated that, “One of the main issues the RTI (Right To Information Law) is trying to resolve is that.
"There is an obligation to developing this system that allows you to capture relevant information as a matter of law”.
He further added that the inability to track the input, output and outcome of these projects will make measuring progress a difficult task.
His suggestion comes at the back of the on-going debate between the New Patriotic Party (NPP) and the New Democratic Congress (NDC) on which of them have undertaken the most infrastructural projects during their term of office.
The CDD-Ghana director, however, indicated that sometimes some political powers do not comply with institutions such as the CCD-Ghana, making it difficult to track the infrastructure and developmental projects embarked on.
He pleaded with the government to come to comply with their requests as enshrined in the RTI law.
Latest Stories
-
GWL inaugurates G-Water Bottling board to drive commercial growth
12 minutes -
People are building on river buffers—GWL on Weija floods
13 minutes -
Akufo-Addo failed Ashanti Region on Afari Military Hospital project – Akwatia MP
14 minutes -
Two injured after gas tanker crash
14 minutes -
“If funds exist for World Cup tickets, why are we unpaid?” — Suppliers picket over Free SHS debt
15 minutes -
Norway backs Ghana’s ocean protection drive as Marine Protected Area gains support
19 minutes -
Kwakye Ofosu rejects claims of discrimination in payment of Presidential staff arrears
19 minutes -
Ghana records 11.35% rise in December 2025 international arrivals
20 minutes -
Resurfaced potholes on Accra–Nsawam highway Leave commuters stranded in traffic
21 minutes -
In the Shadow of the Valley: Where life, work and lead exposure converge
24 minutes -
AfCFTA built on decades of African integration efforts – Dr Fareed Arthur
25 minutes -
Ghana’s 6.4% GDP growth: A call to build skills, jobs and productivity
28 minutes -
Education Minister promises one-week timeline to clear GH¢50m Free SHS supplier arrears
32 minutes -
Kwakye Ofosu accuses Kow Essuman of ‘lies and mischief’ over presidency budget claims
33 minutes -
Akosombo Substation fire caused by insulation failure, not sabotage – Investigation Committee
36 minutes