Audio By Carbonatix
Roads and Highways Minister, Mr Kwasi Amoako-Atta, has directed Maripoma Limited, an engineering company constructing the Accra-Kumasi road to complete a major sectional repair of the Medie-Nsawam stretch and open it to traffic within a 2-week period.
Upon completion, the single-lane stretch would be expanded to a dual-carriageway and help ease traffic congestion on the road during and after the Christmas festivities.
The Minister gave the directive during an inspection of the progress of the project.
He was accompanied by representatives from the Ministry, the Ghana Highways Authority and the Ga West Municipal Assembly.
“What I am telling you is not an appeal. It’s a precise directive that I’m giving you. Make an arrangement to work day and night because between now to Christmas, we will have heavy traffic on our roads and inconveniences must be minimal as much as possible for motorists,” he said.
Mr Amoako-Atta said the Accra-Kumasi road was a central corridor that conveyed motorists to different parts of the country.
He, therefore, tasked the engineers to speed up with the repairs on the service roads, to represent the score fraction of the main dual-carriage project.
The Minister reiterated: “I know you are capable and have the efficiency to work as you won the contract on the basis of competence. I want to see major work going on; I mean real action on the ground.”
Mr Ahmed Saeed, the Lead Engineer working, gave an assurance that they were going to heed to the directive of the Minister and deliver as expected.
However, he entreated the Minister to get them a “right of way” to work in order not to slow the progress of their work.
Latest Stories
-
Nitiwul, Accra Mayor clash over Konkomba Yam Market demolition for 24-Hour-Economy market
6 minutes -
BoG urges digital asset businesses to build compliance into operations at Digital Assets Summit Africa
10 minutes -
NGIS Money Market Fund’s net assets rise 33.3% to GH¢11.78m
11 minutes -
Vaglas join Vughin to mark Dɛng Festival of Sonyor in Savannah Region
34 minutes -
Ghanaian model Eligere Di Merrebel attends 2026 Venice Film Festival
39 minutes -
“You can’t take our GH¢82m and run away to Nigeria” – Roads Minister fires Enchi–Elubo road contractor
41 minutes -
GCB Bank unveils GH¢1m unsecured loans to boost business growth at Kumasi MSME Caravan
43 minutes -
Education chanllenges: NPP not interested in gov’t failure, but we will hold them to account – Dr Kwabena Tandoh
50 minutes -
Kristo Asafo Bompata branch members allege post-funeral attacks
51 minutes -
‘Show up Friday or lose the contract’ – Roads Minister warns Top International over abandoned Enchi–Elubo road
52 minutes -
Customs revenue jumps to 450 million dollars monthly since AI introduction
58 minutes -
There is policy divergence at Education Ministry – NPP Education Committee spokesperson
1 hour -
Police recover AK-47, 186 rounds of ammunition after gunfight in Accra
1 hour -
Three classrooms, two teachers, one community: The struggles of Bresuano MA basic school
1 hour -
Proposed Chinese, Arabic languages: We cannot run our education on contradictions – Dr Kwabena Tandoh
1 hour