Audio By Carbonatix
Preparatory works towards the rehabilitation of the Adomi Bridge at Atimpoku in the Asuogyaman District began on Wednesday.
Mr Joe Gidisu, Minister of Roads and Highways, said in a speech read on his behalf that the rehabilitation works had two Phases.
Phase one involves survey or engineering studies while phase two involves the physical rehabilitation of the bridge.
According to him, the engineering studies were being funded with a grant of Euros 80,000 from the Austrian government.
The Austrian government has also provided 12.4 million Euros as loan for the rehabilitation of the bridge.
Mr Gidisu said it was expected that the engineering studies would be completed in about two months and by the fourth quarter of the year, the actual rehabilitation works should start.
Messrs MCE Stahl and Maschinenbau and Schindelar ZT GmbH, both of Austria, are the engineering firms undertaking the engineering studies and later the rehabilitation works.
He said when the rehabilitation works start, the bridge would be completely shut down to traffic but ferry services would be re-launched at Senchi as an alternative route for motorists and commuters.
During the survey works, there will be an alternating system of closing the bridge.
It will however be opened to traffic after 1800 hours each day. Alternative routes to use are the Asikuma-Ho-Adidome-Sokakope Road and the Ho- Denu -Sogakope Road.
Empty and loaded vehicles weighing below five tons may use the route over the Kpong Dam during the closures of the bridge.
Mr Gidisu said the rehabilitation works when completed would enable the Ministry to lift restrictions on axle loads and to fully restore services to the travelling public.
He said the bridge, which was built in 1956/57, formed a strategic link in the trunk road network in Ghana.
It connects a substantial part of the Volta and Northern regions and part of the Eastern Region to the rest of the country, thereby facilitating trade and regional integration.
However, due to increased overloading by heavy goods vehicles over the years, the bridge developed cracks in its transverse beams in 2008.
Mr Gidisu said the situation has compelled the Ministry to arrange and repair of the cracks.
Source: GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Enimil Ashon: A Ghanaian would’ve taken NDC/NPP flag to space
21 minutes -
‘Help enlist me into police service’ – Suspect in alleged armoured vehicle theft pleads in court
49 minutes -
Carrick leaves door open for Rashford return
54 minutes -
A moment of risk and opportunity: How two ceasefires could boost US-Iran talks
2 hours -
We’re bleeding, not gov’t – Oil marketers calls for suspension of statutory taxes and levies
2 hours -
GFA seals partnership deal with X1 to power Black Stars and Division One League Super Cup
3 hours -
Final decision in marriage must rest with couple, not family – Kweku Frimpong
3 hours -
Media must lead coordinated fight against misinformation – REMAPSEN at One Health Summit
4 hours -
Ghana deepens migration partnership as Interior Minister recieves EU-IOM equipment for NADMO
4 hours -
Cioaba Aristica Aduana future uncertain over family issues – CEO Atta Poku
4 hours -
HAC-CER named Best Ulcer Product of the Year
5 hours -
Nations FC reach first-ever FA Cup final with win over Aduana
5 hours -
Accra to hold National Sanitation Day clean-up on April 18
5 hours -
Judicial decisions should be guided by law, “common sense” – Afenyo-Markin tells judges
5 hours -
GMet forecasts thunderstorms, rain across parts of Ghana, mist expected in forest zones
5 hours