Audio By Carbonatix
Preparatory works towards the rehabilitation of the Adomi Bridge at Atimpoku in the Asuogyaman District began on Wednesday.
Mr Joe Gidisu, Minister of Roads and Highways, said in a speech read on his behalf that the rehabilitation works had two Phases.
Phase one involves survey or engineering studies while phase two involves the physical rehabilitation of the bridge.
According to him, the engineering studies were being funded with a grant of Euros 80,000 from the Austrian government.
The Austrian government has also provided 12.4 million Euros as loan for the rehabilitation of the bridge.
Mr Gidisu said it was expected that the engineering studies would be completed in about two months and by the fourth quarter of the year, the actual rehabilitation works should start.
Messrs MCE Stahl and Maschinenbau and Schindelar ZT GmbH, both of Austria, are the engineering firms undertaking the engineering studies and later the rehabilitation works.
He said when the rehabilitation works start, the bridge would be completely shut down to traffic but ferry services would be re-launched at Senchi as an alternative route for motorists and commuters.
During the survey works, there will be an alternating system of closing the bridge.
It will however be opened to traffic after 1800 hours each day. Alternative routes to use are the Asikuma-Ho-Adidome-Sokakope Road and the Ho- Denu -Sogakope Road.
Empty and loaded vehicles weighing below five tons may use the route over the Kpong Dam during the closures of the bridge.
Mr Gidisu said the rehabilitation works when completed would enable the Ministry to lift restrictions on axle loads and to fully restore services to the travelling public.
He said the bridge, which was built in 1956/57, formed a strategic link in the trunk road network in Ghana.
It connects a substantial part of the Volta and Northern regions and part of the Eastern Region to the rest of the country, thereby facilitating trade and regional integration.
However, due to increased overloading by heavy goods vehicles over the years, the bridge developed cracks in its transverse beams in 2008.
Mr Gidisu said the situation has compelled the Ministry to arrange and repair of the cracks.
Source: GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Imagination Africa, Mentors Chess Academy to host second African Genius Chess Championship at Ghud Park
2 hours -
Techiman South MP ends decades of water struggle in Asutia
3 hours -
Three things we’ve learnt about the UK economy from the IMF
3 hours -
Nana B passport claims a diversionary tactic — Abu Jinapor
3 hours -
Pope Leo diagnosed with cancer as doctors remove lobe of lung, Vatican says
3 hours -
Legal Aid Commission takes free legal services to Techiman main lorry terminal
3 hours -
Nana B denies seeking passport favour, accuses Ablakwa of failing to account for GH¢16.4m
3 hours -
Young girls demand climate action, stronger protection against child marriage
4 hours -
Ex-gang boss sentenced to 40 years for orchestrating Tupac Shakur’s murder
4 hours -
From near-deferral to three awards: UMaT graduate’s academic journey
4 hours -
Atta Akyea denies seeking presidential pardon for Wontumi in galamsey case
4 hours -
Sasaabi scam centre busted: 19 arrested, 117 trafficking victims identified in global crackdown
4 hours -
Photos: Mahama commissions 85-bed Police Hospital ward, donates two ambulances
4 hours -
GTEC directs Ghana’s public universities to reopen by October 16 and begin lectures on October 19
4 hours -
Star Oil donates GH¢1million towards construction of new CID facility
5 hours