Audio By Carbonatix
At least five persons have died in crashes on the deteriorating Sogakope Bridge that spans the lower part of the Volta River.
District Chief Executive (DCE) for South Tongu, Emmanuel Louise Agamah, says the bridge is now a death trap and needs urgent repairs to save lives.
"This bridge is an important link in the Abijan - Lagos Corridor Road but it is detoriated now. The expansions have deteriorated. There are pot holes on the bridge and whenever drivers and motorists try to dodge the potholes, they crash in the process leading to numerous deaths.”
Even this year, five people have lost their lives while serveral others have sustained injuries on the bridge. The residents are angry and want to demonstrate but we usually have to calm tempers down. I have sent letters on several occasions to Ghana Highways Authority and I have ask questions on when this bridge will be repaired but to no avail," Mr. Agamah told the Ghana News Agency
Mr. Amadu Kormpalla, Station Master, Sogakorpe Lorry Station, who was a worker during the construction of the bridge, said: "The rods on which the bridge is resting, are very tinny and if you take a careful look, you could see that they have all rusted and look very weak.
“See, this bridge will kill about thousands of people one day before authorities will take any action," he lamented.
Community members, drivers and motorists were afraid the bridge would give way and cause a lot of deaths because part of the 650-meter bridge shook even when motorbikes passed on it yet heavy trucks are allowed to use it.
"We have only been praying that God will protect us throughout the day because this is what we do for a living. We tried to demonstrated [about it] but the DCE calmed us assuring us that it will be done in Easter and till date, no sign of even the contractor, " Sammy, a driver, stressed.
Even this year, five people have lost their lives while serveral others have sustained injuries on the bridge. The residents are angry and want to demonstrate but we usually have to calm tempers down. I have sent letters on several occasions to Ghana Highways Authority and I have ask questions on when this bridge will be repaired but to no avail," Mr. Agamah told the Ghana News Agency
Mr. Amadu Kormpalla, Station Master, Sogakorpe Lorry Station, who was a worker during the construction of the bridge, said: "The rods on which the bridge is resting, are very tinny and if you take a careful look, you could see that they have all rusted and look very weak.
“See, this bridge will kill about thousands of people one day before authorities will take any action," he lamented.
Community members, drivers and motorists were afraid the bridge would give way and cause a lot of deaths because part of the 650-meter bridge shook even when motorbikes passed on it yet heavy trucks are allowed to use it.
"We have only been praying that God will protect us throughout the day because this is what we do for a living. We tried to demonstrated [about it] but the DCE calmed us assuring us that it will be done in Easter and till date, no sign of even the contractor, " Sammy, a driver, stressed.DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
IFC, LMI Holdings expand partnership to power Ghana’s industrial growth
8 minutes -
Ashanti Regional Police arrest two foreign nationals over alleged kidnapping and murder of Senegalese goalkeeper Cheikh Toure
10 minutes -
Rein in NIB over attempted arrest of Baffour Awuah – Kyei-Mensah-Bonsu
11 minutes -
Black Queens captain Portia Boakye joins Mexico’s UNAM Pumas
21 minutes -
Attempted arrest of Baffour Awuah was unjustified and dangerous – Kyei-Mensah-Bonsu
22 minutes -
La Shikitele Nii Adjei Koofeh IV denies responsibility for Laboma Beach Resort demolition
27 minutes -
Sentuo Oil Refinery urges government to price Ghana’s local crude oil in cedis
34 minutes -
GNFS honours two officers for rescue efforts during Sogakope floods
36 minutes -
Government pauses Agbogbloshie 24-Hour Economy Market redevelopment for consultations
37 minutes -
Dr Kwabena Bempah Tandoh engages Mim market traders as Parliamentary campaign gathers momentum
42 minutes -
PURC keeps electricity and water tariffs unchanged for fourth quarter of 2026
49 minutes -
Ejisu Police release parents, arrest caretaker over missing five-month-old baby from Asafo Market
1 hour -
AfCFTA needs efficient payment systems, borders and infrastructure to boost intra-African trade – Wamkele Mene
1 hour -
Kow Essuman confident NPP will reclaim Ablekuma West ‘with a huge margin’
1 hour -
Today’s front pages: Thursday, September 24, 2026
1 hour