
Audio By Carbonatix
The Ghana National Gas Company (Ghana Gas) has expressed satisfaction with work on the Atuabo Gas Plant as a test run on the plant proved successful.
A series of tests was carried out over the weekend on the 111-kilometre Onshore pipelines from Atuabo in the Ellembelle district to Aboadze in the Shama district.
The test formed part of the process to check the integrity of the pipeline and to identify and correct potential leakages along the pipeline before the tie-in of the Atuabo Gas Processing Plant (GPP) to the Jubilee field gas reservoirs.
It followed the conclusion of mechanical completion of the Western Corridor Gas Infrastructure Development Project (WCGIDP) and successful hydro-testing of its Offshore Pipeline.

A statement from GGC however, indicated: “During the test, a pin-hole leak was identified at one of the over 10,000 pipe joints laid under the surface of the earth. Appropriate isolation valves have subsequently been engaged and plans for remedial works promptly begun”.
“We are satisfied with the test on the onshore pipeline and we are excited by the fact that just a small portion of the pipeline has thrown up a minor challenge that would be rectified by tomorrow” Director of Operations, Dr Ben Asante, said.
The statement assured the public that “there are no safety concerns whatsoever and we are satisfied with the safety protocol being employed for the testing of the pipeline”.
Latest Stories
-
Utility companies should fix their losses, not pass to consumers – AGI
2 minutes -
AI and the future of Jobs: Ghana’s AI Strategy and opportunities for youth action
27 minutes -
Ghana scores 22 out of 100 on budget transparency, raising accountability concerns
30 minutes -
Sentuo Oil Refinery expansion to create 1,500 jobs, boost energy security – John Jinapor
43 minutes -
Adwoa Safo: JoyNews at sickbed of injured former Dome-Kwabenya MP
50 minutes -
Partey wins JAC Motors MVP award after performance in Black Stars draw with England
56 minutes -
GES PRO urges GTEC to publish accredited institutions instead of focusing on unaccredited schools
1 hour -
WASSCE candidate who died after final paper identified as 18-year-old Notre Dame SHS student
1 hour -
Sentuo Oil Refinery capacity to increase from 40,000 to 100,000 barrels per day – Energy Minister
1 hour -
GTEC list of unrecognised institutions in Ghana: Doxa, Debest, Faith University among 70+ flagged
1 hour -
Unilever. Guinness. FanMilk. Kasapreko beat them all
1 hour -
Trump asks Congress for $87.6bn for Iran war after Republican showdown
1 hour -
Explorco to start Voltaian Basin oil drilling in 2026 as Sentuo refinery expands to 100,000 barrels per day
1 hour -
GJA seeks legal guidance after journalist Larry Dogbey is jailed for contempt
2 hours -
NPP refers petitions against Kennedy Agyapong to disciplinary committee
2 hours