Audio By Carbonatix
President Akufo-Addo has expressed satisfaction with the progress of work on the reconstruction and mordernisation of the Maternity and Children’s block of the Komfo Anokye Teaching Hospital, in Kumasi.
Inspecting the project on Monday, 17th October 2022, as part of his four-day working visit to the Ashanti Region, the President was informed that the project, thus far, has seen a 100% demolition of the old structure, with the current progress of work about 60 percent complete.

It will be recalled that on Friday, 15th May 2020, the President cut the sod for the re-activation of work on the Maternity and Children’s ward at the teaching hospital after over four decades of neglect.
Before this, the Akufo-Addo government, represented by the Ministry of Health had on 6th November, 2019, employed Contracta Construction UK Limited for the design, execution and completion of works and the remedying of any defects, which include the re-modelling and completion of shell spaces for the existing building structure.

Subsequently, after the Contractor’s structural integrity report for the existing building structure, Government decided to revise the scope of works in November 2020 to include complete demolition of the old existing structure, and a re-design, construction and complete equipping of the new and modern mother and child health facility
The revised contract also includes the provision of a 3-year maintenance program for medical equipment with training and technical assistance, procurement of medical and non–medical consumables, and the training of needed human resource training, technical assistance and mentorship programmes.

The new design has eight floors, 22 consulting rooms, three group consulting rooms, two consulting rooms for adult emergencies, two consulting rooms for paediatric emergencies, three Auditorium [45 seats, 43 seats and 145 seats], five seminar rooms (14 seats) and 506 beds with the capacity to hold, 199 paediatric cots, 136 paediatric beds, 19 birthing beds and 152 adult beds.
Additionally, the block will also have one Obstetrics Theater, seven General Theatres, Pharmacy, Dispensaries, Laboratories as well as Ancillary spaces.

Once completed, it will house an intensive care unit, a high dependency unit, isolation rooms and student lecture halls, with the capacity to provide catering services for staff, patients and students.
The expanded works have also resulted in the ongoing reconstruction of the Station Basic School classroom block at the UDDARA Barracks, which is scheduled to be completed by January 2023.
Latest Stories
-
Today’s Front pages: Tuesday, January 13, 2026
8 minutes -
Galamsey fight: Western Regional Minister calls for real-time monitoring of water bodies
10 minutes -
NPP has lost its identity, the current party is “fake” – Prof Frimpong-Boateng
20 minutes -
GRA targets GH¢225bn revenue in 2026 as VAT reforms take effect
29 minutes -
Heath Goldfields promises community-centered revival of Bogoso-Prestea Mine
30 minutes -
Ghana’s development visions lack scientific foundation – Frimpong-Boateng
34 minutes -
Interior Minister confirms arrest over fake security service recruitment scheme
36 minutes -
Ghanaians would’ve laughed at us if you were appointed Finance Minister – Richard Nyama to Stephen Amoah
39 minutes -
Police nab suspect who beat landlady to death at Agona Nyakrom
43 minutes -
Re-electing old flagbearer will be a “trainwreck” for NPP – Prof Frimpong-Boateng
43 minutes -
Police arrest seven alleged human traffickers, rescue 48 victims in Ho
48 minutes -
One dead, three injured in ghastly crash on Kibi–Suhum Road
52 minutes -
Bawumia is a nice person but can’t lead Nkrumah’s Ghana – Frimpong-Boateng
1 hour -
Amin Adam took over a rotten economy and fixed it; he isn’t your mate – Richard Nyama to Stephen Amoah
2 hours -
BoG sets strict Ghana Card rule for financial transactions
2 hours
