Audio By Carbonatix
A 50-megawatt land-based solar power plant, targeted at fostering industrial growth and enhancing energy resilience in the country, has been commissioned at Galgu in the Yendi Municipality of the Northern Region.
The facility, worth about $59 million, is spearheaded by the Bui Power Authority ( BPP) in collaboration with the Grid Company Limited, and financed by First Sky Limited under an engineering, procurement, construction, and financing agreement.
The solar power plant, operated by harnessing sunlight and converting it into electricity, would be fed directly into the national grid.
Mr Samuel Kofi Dzamesi, Chief Executive Officer, Bui Power Authority, speaking during the commissioning of the facility at Galgu, said it was to expand sustainable power generation and to reaffirm the government’s commitment to increasing renewable energy to 10 per cent of the country’s energy mix by 2030.
The ceremony was also used to commission the Grid Company Limited’s building, another layer of the facility, which would help evacuate the power generated to other sub-stations of the BPP.
Mr Dzamesi said the solar plant would not only support Ghana’s climate goals by reducing dependence on fossil fuels but also help to address the energy needs, particularly in the northern part of the country.
He said it would help create more employment opportunities in the area whilst at the same time enhance more reliable and cost-effective electricity supply into the national grid.
He added that local businesses would be stimulated, and new investments would be attracted to the region, and urged residents to own the facility by protecting it.
Alhaji Shani Alhassan Saibu, Northern Regional Minister, who was represented by Alhaji Hammed Abubakar Yussuf, Yendi Municipal Chief Executive, was optimistic that the facility would stimulate sustainable socio-economic growth and development to further consolidate the peace in the Dagbon Traditional Area.
Meanwhile, prior to commissioning the facility, Mr Dzamesi and other dignitaries paid a courtesy call on the Ya-Na Abukari (II), Overlord of Dagbon at his palace in Yendi to commend him for providing a 140-acre land to enable the construction of the facility in the area.
Ya-Na Abukari (II) commended the BPP and partners for the initiative, and pledged to ensure that the facility was protected to enable it achieve its intended purpose for the area.
Latest Stories
-
Labubu toy manufacturer exploited workers, labour group claims
28 seconds -
Lawerh Foundation, AyaPrep to introduce Dangme-language maths module
31 minutes -
US forces seize a sixth Venezuela-linked oil tanker in Caribbean Sea
40 minutes -
Votes being counted in Uganda election as opposition alleges rigging
47 minutes -
Ntim Fordjour accuses government of deliberate LGBT push in schools
47 minutes -
National security task force storms ‘trotro’ terminals to halt illegal fare hikes
50 minutes -
U.S. visa restriction development for Ghana concerning – Samuel Jinapor
51 minutes -
Uganda election chief says he has had threats over results declaration
58 minutes -
Quality control lapses allowed LGBT content into teachers’ manual – IFEST
58 minutes -
Akufo-Addo’s name will be “written in gold” in Ghana’s history in the fullness of time – Jinapor
1 hour -
Tread cautiously about financial hedging – US-based Associate Professor to BoG
1 hour -
LGBTQ curriculum row: Quality control failure, not timing, caused teacher manual controversy – Dr Anti-Partey
1 hour -
Banks wrote-off GH¢1.39bn as bad debt in 10-months of 2025
1 hour -
I cannot rate the lands minister’s performance, but… – Abu Jinapor
1 hour -
Accra’s traffic to blame for public transport crisis—GPRTU
1 hour
