Audio By Carbonatix
Drivers and passengers who use the Suhum section of the Accra-Kumasi highway are complaining bitterly about the poor nature of the road.
The Apedwa-Suhum stretch has been under construction since 2008.
But some travelers have gotten stranded and even had to pass the night on that road after recent heavy rains.
Both drivers and passengers want authorities to do something about the road before the 2013 deadline for completion.
Some drivers at the Neoplan station here in Accra have been sharing their frustrations with Joy News.
One driver said the Apedwa-Suhum section of the road was so terrible it was a pain driving on it.
Another driver said his vehicle had been parked because he needed GHC2,500 to replace his absorbers which wore out by dint of the bumpy nature of the road.
Roads and Highways Minister, Joe Gidisu, has promised the road will be fixed by October.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Trump administration reclassifies cannabis as less dangerous
1 minute -
Black Stars is my biggest challenge yet – Carlos Queiroz
3 minutes -
“From party builder to Presidential contender: The calculated rise of Julius Debrah”
4 minutes -
Ghana’s Mariam Mohammed wins 2025 JAY Lit Prize
4 minutes -
Coaching Black Stars is the ‘biggest challenge’ and ‘I am ready’ – Carlos Queiroz
7 minutes -
Youth urged to think critically, question content and verify facts in fight against misinformation
17 minutes -
Livestream: GFA unveils new Black Stars Coach
18 minutes -
Accra High Court adjourns Ofori-Atta case to May 26 pending OSP appeal
21 minutes -
Victor Yaw Asante takes up international banking role
24 minutes -
Victor Yaw Asante takes up international banking role
27 minutes -
ECG MD inspects key infrastructure in Ashanti region for improved power supply
30 minutes -
Photos: Mahama meets Eastern Regional Chiefs, reaffirms commitment to development agenda
1 hour -
CSOs demand independent public prosecutor to strengthen anti-corruption fight
1 hour -
Mahama calls for stronger collaboration with chiefs to curb land-related conflicts
1 hour -
KATH CEO blames “no bed syndrome” on abandoned infrastructure projects
1 hour